= LhARA radiobiology; meeting: 05Feb26; 14:00 BST = **ZOOM:** https://imperial-ac-uk.zoom.us/j/98220889714?pwd=SM90vOF7BKSXoU3mD9q7OwBQo4IVB3.1 Attended: KL, RW, CW, RA, PH, MB, AFr, MH, EM, CD == Meeting Notes == 1. Minutes and actions completed: - **AFr, DA**: Write out RCF procedure document - **DONE** - **CD**: Use sim to answer how many protons per shot in each fibre - **DONE** 2. In-Person Meeting - Date: DECIDED 24th Feb at Birmingham - Discussion on location - Confirmed Birmingham. Jason and Emma to book a room for max 20 people. - Invite LMU to join online - Invite Liverpool to share their work on air scintillation - Invite Chris Armstrong to join for instrumentation section - Draft Agenda: https://indico.stfc.ac.uk/event/1834/ - Make clear to include timetables for SCAPA and ELIMED (and LMU) - Make clear a section on improved survival rates of cells 3. SCAPA RW,ED: - General Update - Laser fixed - Running a DSTL till mid-march, going to be around April before access again - Josie asked for Dipoles from IoM charity. Waiting outcome 4. Bio EM,JP,MB: - Actions Checklist - **MB/EM**: Send and evaluate the cells - Delivered - **EM, JMcG**: Write up summary of PoPLaR Phase 2, including technical summary of cell irradiation procedure - **EM**: Share the counting software she uses with Marie - **Done** - Oxford Optronix, Gelcount - **MB**: Comet analysis - General Updates - Cells have been delivered to Birmingham - Looks like nothing on HeLa. FaDu looks more promising - Caution required due to dose variation - Before next run inform Marie the dates so she can book out the incubator to be used - Ideas to improve cell survival rates - Swap out HeLa with Glioma cell line (EBW). More robust. - Would need to send some to Birmingham - Emma to email Rosh about when to take them out the freezer - Dry runs indicate that if the cells are only out for 20/25mins then good survival - Remove the RCF after irradiation reduces time drastically - Cells could be too cold - Heating the whole holder could provide enough heat to keep the cells warm for longer - Cells could be hypoxic - Pre-gas the cells? - Keep the holder rotating so that the cells stay wet during irradiation 5. Beamline Diagnostic, KL, TP, CD, PH: - Actions Checklist - **EM/ED/LJ**: Send calibration films to SCAPA and scan them in both orientations - Delivered - **AFr, DA**: Write out RCF procedure document - **DONE** - **CD, TP**: Evaluate LET in the cells with the RCF in front - **CD**: Use sim to answer how many protons per shot in each fibre - **DONE** - Protons per Fibre - CD - [raw-attachment:ProtonsPerFibre.pptx Slides] - Estimating that the beam delivers 0.2mJ per shot per fibre, which works to 200W - Oversaturation problem? - Overview of RCF document - [raw-attachment:"RCF Scanning Protocols for LhARA (2026).pdf" Doc] - General Updates - CD, RW and AFr to discuss the best way to scan RCF 6. DoNM - 19th Feb 14:00 7. AoB - Prepare a summary for LhARA fortnightly on the day of the meeting === Summary of actions required === Phase 2 Analysis - **EM**: Evaluate the cell results - **CD, AFr**: Complete analysis of RCF with errors - **EM/ED/LJ**: Send calibration films to SCAPA and scan them in both orientations - **CD, RW and AFr**: Explain scanning procedure - **EM, JMcG**: Write up summary of PoPLaR Phase 2, including technical summary of cell irradiation procedure - **MB**: Comet analysis - **CD**: Invite Liverpool, Chris Armstrong and LMU to join the in-person meeting Beam Diagnostics - **Unassigned**: Find all the errors associated with RCF - **RW, CD**: Study correlation between laser diagnostics and mean dose - **CD, TP**: Evaluate LET in the cells with the RCF in front Improve Bio results - **EM**: Inform Roshine when to defrost Glioma cell line - **Unassigned**: Obtain an inverted microscope Long-term - **CD, JMcG**: Investigate how to achieve uniformity without a scatterer in place - **KL, CW**: Cost 4 or 6 quad, and chicane systems ----