| Version 2 (modified by , 3 months ago) ( diff ) |
|---|
LhARA radiobiology; meeting: 19Feb26; 14:00 BST
ZOOM: https://imperial-ac-uk.zoom.us/j/98220889714?pwd=SM90vOF7BKSXoU3mD9q7OwBQo4IVB3.1
Attended: KL, CW, JMcG, AFr, MH, PH, EM, CD
Meeting Notes
- In-Person Meeting
- Date: 24th Feb at Birmingham
- Room Booked
- Start at 10:30am
- Schedule needs adjusting to fit this
- Narender to present on air scintillation
- Send confirmation email to all invited
- LION Simulations
- Show that for a ~330T/m the precision to cause unusual beam shapes is:
- microns in transverse offsets
- millimeters in longitudinal offsets
- microradians in rotation about the x- and y-axes
- milliradians in rotation about the z-axis
- Check the resolution of the positioning of PMQs at SCAPA
- DoNM
- 5th Mar 14:00
- AoB
- CAD Model: Handling Assembly Parts.zip CAD
Summary of actions required
Phase 2 Analysis
- EM: Evaluate the cell results
- CD, AFr: Complete analysis of RCF with errors
- EM/ED/LJ: Send calibration films to SCAPA and scan them in both orientations
- CD, RW and AFr: Explain scanning procedure
- EM, JMcG: Write up summary of PoPLaR Phase 2, including technical summary of cell irradiation procedure
- MB: Comet analysis
- CD: Invite Liverpool, Chris Armstrong and LMU to join the in-person meeting
Beam Diagnostics
- Unassigned: Find all the errors associated with RCF
- RW, CD: Study correlation between laser diagnostics and mean dose
- CD, TP: Evaluate LET in the cells with the RCF in front
Improve Bio results
- EM: Inform Roshine when to defrost Glioma cell line
- Unassigned: Obtain an inverted microscope
Long-term
- CD, JMcG: Investigate how to achieve uniformity without a scatterer in place
- KL, CW: Cost 4 or 6 quad, and chicane systems
Attachments (1)
- Cell Handling Assembly Parts.zip (59.0 MB ) - added by 3 months ago.
Download all attachments as: .zip
Note:
See TracWiki
for help on using the wiki.
