Changes between Initial Version and Version 1 of Research/LhARA/RadiationBiology/Meetings/2026-07-23


Ignore:
Timestamp:
Jul 21, 2026, 1:43:44 PM (3 weeks ago)
Author:
ccd24
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • Research/LhARA/RadiationBiology/Meetings/2026-07-23

    v1 v1  
     1= LhARA radiobiology; meeting: 23Jul26; 14:00 GMT =
     2
     3**ZOOM:** https://imperial-ac-uk.zoom.us/j/98220889714?pwd=SM90vOF7BKSXoU3mD9q7OwBQo4IVB3.1
     4
     5== Agenda ==
     6
     71. General Discussion
     8 - Robbie mentioned that beamtime might be more likely in February.
     9 - Colin believes we might be able to get some time in Autumn if we can time it correctly with other beamtime.
     10 - There is work where the SCAPA team are using AI and looking at the variability of the laser.
     11 - Colin to discuss with Robbie how to build the setup with another experiment
     12
     132. Instrumentation
     14 - General
     15  - Colin suggested filling the carousel and running 1 shot then repeating with 2 shots etc
     16  - Each cell dish would have Lanex around it or something for real-time measurement
     17  - Then we could skip the calibration stage by comparing the variation in the Lanex signal with the known variation in dose
     18  - Problems involve the number of cells needing to be collected and the time that would take
     19  - Needs discussion with bio team
     20 - SciFi
     21  - Need to actually test whether the transporting fibre will scintillate
     22  - Operate on the assumption it does not
     23  - If it does Peter has ordered hollow-fibre
     24  - Might be able to use a standrad fibre-optic connector
     25 - ICT
     26  - Colin has ICTs
     27  - 3-5ns rise time, so should see the short pulses but on the edge of visible and may be blurred out
     28  - 0.1V in signal per Amp in beam current
     29  - Beam would also need to be roughly symmetric, so has to be after the scatterer
     30  - There is also a smaller, more sensitive ICT we could use
     31  - Also possibilities with 3D printing
     32
     333. Overview of Trello
     34 - Reminder plan is laid out in the google doc and can be changed
     35 - Trello: https://trello.com/invite/b/67587c515b0c69656ee78b48/ATTIe86f94b24e3e5884e4cb87e5ed3b89ab64321B83/poplar
     36 - Planning next SCAPA Document: https://docs.google.com/document/d/1OTARVtxhLRu02S6CLdRDB2QlGvCqDfZ3aWBifjIFs_Q/edit?usp=sharing
     37
     384. DoNM
     39 - 23/07/26
     40
     415. AoB
     42
     43
     44=== Summary of actions required ===
     45
     46In-Beam Diagnostics
     47- **Unassigned**: Acquire a glass sheet
     48- **Unassigned**: Get a new RCF batch and calibrate
     49- **TP**: Testing delaminating EBT3
     50- **PH**: Obtain transparent fibre or an alternative method for light transport
     51- **PH**: Obtain a lens for hollow fibre tests
     52- **CD**: Simulate energy deposited in transport fibres
     53- **KL, CD, JMcG, PH**: Design a system to make full scifi prototypes
     54- **KL, CD, JMcG, PH**: Make a full scifi prototype
     55- **KL, CD, JMcG, PH**: Discuss visit to Birmingham to test SciFi
     56- **RW, CD**: Study the correlation between laser diagnostics and mean dose
     57- **Unassigned**: Investigate how a phosphor sheet could be incorporated into the design of the cell dish
     58- **CW**: Investigate the feasibility of ICTs for our beamline
     59
     60Bio Next Steps
     61- **EM, CD, JMcG**: Write up technical summary of Phase 2
     62- **EM**: Write up a biology plan for a 2 PMQ setup
     63- **Unassigned**: Obtain an inverted microscope
     64- **Unassigned**: Obtain multi-chamber haemocytometers (Might be able to use Birmingham's)
     65- **Unassigned**: Obtain a thermostat for the incubator
     66- **MB, JP, MB**: Meet up to plan cell survival dry run and a bio plan for a 2 Quad setup
     67- **EM**: Run controls to examine how long the cells can survive vertically
     68
     69Beamline Modelling
     70- **CD**: Examine energy spectra variation
     71- **RW, CD**: Source characterisation
     72
     73Alternate Beamlines
     74- **JMcG**: Simulate BELLA
     75- **JMcG**: Simulate ELI
     76
     77----