Changes between Initial Version and Version 1 of Research/LhARA/RadiationBiology/Meetings/2026-08-06


Ignore:
Timestamp:
Aug 4, 2026, 5:25:00 PM (4 days ago)
Author:
ccd24
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • Research/LhARA/RadiationBiology/Meetings/2026-08-06

    v1 v1  
     1= LhARA radiobiology; meeting: 06Aug26; 14:00 BST =
     2
     3**ZOOM:** https://imperial-ac-uk.zoom.us/j/98220889714?pwd=SM90vOF7BKSXoU3mD9q7OwBQo4IVB3.1
     4
     5Planning Document: https://docs.google.com/document/d/1OTARVtxhLRu02S6CLdRDB2QlGvCqDfZ3aWBifjIFs_Q/edit?tab=t.0
     6
     7Trello: https://trello.com/invite/b/67587c515b0c69656ee78b48/ATTIe86f94b24e3e5884e4cb87e5ed3b89ab64321B83/poplar
     8
     9== Meeting Agenda ==
     10
     111. BioPrep
     12- Josie: Summary of last week's biology meeting
     13
     142. Instrumentation
     15- Scifi:
     16 - Unlikely to get clear fibre to Robbie before he goes to ELI and want to test it at Birmingham first
     17 - Equipment currently at Queen Mary's (Ken talking to them)
     18- Air Scintillation
     19 - Colin/Narendar: Update on feasibility of the implementation at SCAPA and the timeframe
     20
     213. SCAPA
     22- General Updates
     23
     244. Alternate Beamlines
     25 - ELI Rejected
     26  - Waiting for feedback
     27
     285. Review Trello: https://trello.com/invite/b/67587c515b0c69656ee78b48/ATTIe86f94b24e3e5884e4cb87e5ed3b89ab64321B83/poplar
     29
     306. DoNM
     31 - 20/08/26
     32
     337. AoB
     34
     35=== Summary of actions required ===
     36
     37In-Beam Diagnostics
     38- **Unassigned**: Acquire a glass sheet
     39- **Unassigned**: Get a new RCF batch and calibrate
     40- **TP**: Testing delaminating EBT3
     41- **PH**: Obtain transparent fibre or an alternative method for light transport
     42- **PH**: Obtain a lens for hollow fibre tests
     43- **CD**: Simulate energy deposited in transport fibres
     44- **KL, CD, JMcG, PH**: Design a system to make full scifi prototypes
     45- **KL, CD, JMcG, PH**: Make a full scifi prototype
     46- **KL, CD**: Send clear fibre to SCAPA before 16th August (Contact Ewan or Colin since Robbie is USA)
     47- **KL, CD, JMcG, PH**: Discuss visit to Birmingham to test SciFi
     48- **RW, CD**: Study the correlation between laser diagnostics and mean dose
     49- **Unassigned**: Investigate how a phosphor sheet could be incorporated into the design of the cell dish
     50- **CW**: Investigate the feasibility of ICTs for our beamline
     51- **MH**: Investigate LET detector
     52- **CW**: Ask Narender about air fluorescence implementation
     53- **JMcG**: Investigate using IF as a dosimeter
     54
     55
     56Bio Next Steps
     57- **EM, CD, JMcG**: Write up technical summary of Phase 2
     58- **EM**: Write up a biology plan for a 2 PMQ setup
     59- **Unassigned**: Obtain an inverted microscope
     60- **Unassigned**: Obtain multi-chamber haemocytometers (Might be able to use Birmingham's)
     61- **Unassigned**: Obtain a thermostat for the incubator
     62- **EM**: Run controls to examine how long the cells can survive vertically
     63- **JMcG**: Plan a test of vertical cell survival using Emma/Jason's HeLa cell line and Marie's cell line
     64- **JMcG**: Produce a HeLa colony that can survive on Mylar
     65
     66Beamline Modelling
     67- **Unassigned**: Investigate how to improve the beamline beyond CV=8%
     68- **CD**: Examine energy spectra variation
     69- **RW, CD**: Source characterisation
     70
     71Alternate Beamlines
     72- **JMcG**: Simulate BELLA
     73- **JMcG**: Simulate ELI
     74
     75----