wiki:Research/LhARA/RadiationBiology/Meetings/2026-09-17

Version 1 (modified by ccd24, 2 days ago) ( diff )

--

LhARA Radiobiology Meeting: 17Sep26; 14:00 BST

ZOOM: https://imperial-ac-uk.zoom.us/j/98220889714?pwd=SM90vOF7BKSXoU3mD9q7OwBQo4IVB3.1

Meeting Agenda

  1. Alternate Beamlines
    • ELIMED part of the next ELI submission?
    • Template document put together for how to deal with problems raised in ELI rejection
  1. BioPrep
    • Update from Rosh and Marie
      • Any cells from Birmingham?
    • Colin seen the X-ray machine yet?
    • Perodi Paper (Flacco et al) with RCF sandwich: 10.1038/s41598-025-01105-z
  1. Instrumentation
    • RCF
      • Updates on delaminated EBT4
    • SciFi
      • Introducing Simon
      • Update on next prototype
    • Fast electrons
  1. Beamline Simulations
  1. SCAPA
    • Updates
  1. Review Trello: https://trello.com/invite/b/67587c515b0c69656ee78b48/ATTIe86f94b24e3e5884e4cb87e5ed3b89ab64321B83/poplar
  1. DoNM
    • 01/10/26
  1. AoB

Summary of actions required

In-Beam Diagnostics

  • Unassigned: Acquire a glass sheet
  • Unassigned: Get a new RCF batch and calibrate
  • TP: Testing delaminating EBT3
    • DONE?
  • PH: Obtain transparent fibre or an alternative method for light transport
    • DONE
  • PH: Obtain a lens for hollow fibre tests
    • DONE
  • CD: Simulate energy deposited in transport fibres
  • KL, CD, JMcG, SdL: Design a system to make full scifi prototypes
  • KL, CD, JMcG, SdL: Make a full scifi prototype
  • KL, CD, JMcG, SdL: Discuss visit to Birmingham to test SciFi
  • RW, CD: Study the correlation between laser diagnostics and mean dose
  • CW: Investigate the feasibility of ICTs for our beamline
  • MH: Investigate LET detector
  • CW: Ask Narender about air fluorescence implementation
  • JMcG: Investigate using IF as a dosimeter
  • GS, RH: Investigate fast electron diagnostic
  • TP: Investigating commerical delaminated EBT4

Bio Next Steps

  • EM, CD, JMcG: Write up technical summary of Phase 2
  • EM: Write up a biology plan for a 2 PMQ setup
  • Unassigned: Obtain an inverted microscope
  • Unassigned: Obtain multi-chamber haemocytometers (Might be able to use Birmingham's)
  • Unassigned: Obtain a thermostat for the incubator
  • EM: Send cells to Rosh and Marie
  • EM, MB, RA, JMcG: Run controls to examine how long the cells can survive vertically
  • CW, AM: Show Alex around SCAPA
  • MB, RA: Send specifications of and transwells to Tony to test at Birmingham
  • MB, RA: Test transwells with x-rays
  • KL: Share paper with interesting cell dishes (RCF sandwich)

Beamline Modelling

  • Unassigned: Investigate how to improve the beamline beyond CV=8%
  • CD: Examine energy spectra variation
  • JMcG, ED: Discuss spectra fits and SCAPA source divergence
  • JMcG: Talk to Darsebury to get more information on sensible dipole parameters

Alternate Beamlines

  • JMcG: Simulate BELLA
  • JMcG: Simulate ELI
  • CD: Planning doc for ELI

Note: See TracWiki for help on using the wiki.