= Simulation and Experiment Meeting 17th September 2019 = == Meeting details == 14:00 Room 532, Blackett Lab. Zoom details: {{{ Join from PC, Mac, Linux, iOS or Android: https://zoom.us/j/881873773 Or iPhone one-tap : United Kingdom: +442036950088,,881873773# or +442030512874,,881873773# Or Telephone: Dial(for higher quality, dial a number based on your current location): United Kingdom: +44 (0) 20 3695 0088 or +44 (0) 20 3051 2874 Austria: +43 (0) 72 011 5988 Meeting ID: 881 873 773 International numbers available: https://zoom.us/u/dh3ipM6bK }}} == Agenda == * Gabor lens update * SciWire update * SmartPhantom update * Round table. * AOB * New server. == Notes == Present: Ruth, Will, HT, Theo, Ajit * Gabor lens update * Design changes in the pipeline. * Pump being refurbished. * SciWire update * Tests with source done but rate from the source much lower than expected so could not see scintillation light. * Will try testing with a torch+collimator. * SmartPhantom update * Winding tests done with fishing wire. Frames being redesigned to improve stiffness and prevent warping. * Round table. * Ruth: Hammersmith machine being used for treatment. * Will: * Working on applications with IBA * HT: Would like scoring planes to simulate the water phantom. * In development branch. Waiting to be merged. * Can consider installing linux on Windows using Windows subsystem for linux on the server. This would allow installing BDSIM in Windows. * Theo: Doing GPT simulations investigating phase space and emittance with different levels of space charge. Optimising design of the arc using MADX. * AOB * New server delivered. Operating system will be installed by ICT.