= Simulation and Experiment Meeting 15th October 2019 = == Meeting details == 14:00 Room 532, Blackett Lab. Zoom details: {{{ Join from PC, Mac, Linux, iOS or Android: https://zoom.us/j/881873773 Or iPhone one-tap : United Kingdom: +442036950088,,881873773# or +442030512874,,881873773# Or Telephone: Dial(for higher quality, dial a number based on your current location): United Kingdom: +44 (0) 20 3695 0088 or +44 (0) 20 3051 2874 Austria: +43 (0) 72 011 5988 Meeting ID: 881 873 773 International numbers available: https://zoom.us/u/dh3ipM6bK }}} == Agenda == * Gabor lens update. * SciWire update. * SmartPhantom update. * Round table. * A.O.B. == Notes == Present: HT, Juergen, Will, Ajit * Gabor lens - JPo * Lens is disassembled. * Currently doing modification drawings to the lens before it is re-assembled. * Pump repair will cost £4k * Bearings damaged. * SciWire - AK * Source tests did not produced scintillation light. Rate from the source was much less than expected. * Could test with collimated torch to investigate cross-talk. * Tests now concluded as lab space is needed for the SmartPhantom. * SmartPhantom - HT * Discussing the aperture and frame thicknesses. Smaller aperture prototype resolved warping but aperture is a bit too small. * Test to illuminate a single fibre longitudinally. * Test optics, readout and image processing software. * Round table - Will * Can spend more time on CCAP work. * BDSIM can't do injection and extraction. * Collating a list of things needed for the simulation. * FFA ring, need to think about how to implement the magnetic field. * Variable frequency cavities. * Could use a field map, have a 4D interpolator. * Space charge: can look at a simple component with and without space charge. * AOB * New server * Nearly ready just waiting for the domain to be assigned. * JPo: ICT installed software and licenses on previous server. * Install Inventor. * Imperial account for Will