'''Minutes''': * Have the same goal as pre-summer, but taking it from a different starting point * Job is to design the detector using 250 micron fibres (already made) * Need to talk to Oliver- engineer – about frame and design * Found that uniformity over a large distance for the fibres was bad * Meetings * Ionoacosutics every thursday (10:00) * Meeting with Ken every week (TBC)