Changes between Version 1 and Version 2 of Research/LhARA/RadiationBiology/Meetings/2026-07-09


Ignore:
Timestamp:
Jul 9, 2026, 3:19:50 PM (3 days ago)
Author:
ccd24
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • Research/LhARA/RadiationBiology/Meetings/2026-07-09

    v1 v2  
    33**ZOOM:** https://imperial-ac-uk.zoom.us/j/98220889714?pwd=SM90vOF7BKSXoU3mD9q7OwBQo4IVB3.1
    44
    5 == Meeting Agenda ==
     5Attended: KL, CW, CD, (JB)
    66
    7 1. SCAPA
    8  - General Update
     7== Meeting Notes ==
    98
    10 2. BioPrep
    11  - General Update
     91. General Discussion
     10 - Robbie mentioned that beamtime might be more likely in February.
     11 - Colin believes we might be able to get some time in Autumn if we can time it correctly with other beamtime.
     12 - There is work where the SCAPA team are using AI and looking at the variability of the laser.
     13 - Colin to discuss with Robbie how to build the setup with another experiment
    1214
    13 3. Instrumentation
    14  - General Update
    15  - Lenses ordered for Hollow Fibre Testing
     152. Instrumentation
     16 - General
     17  - Colin suggested filling the carousel and running 1 shot then repeating with 2 shots etc
     18  - Each cell dish would have Lanex around it or something for real-time measurement
     19  - Then we could skip the calibration stage by comparing the variation in the Lanex signal with the known variation in dose
     20  - Problems involve the number of cells needing to be collected and the time that would take
     21  - Needs discussion with bio team
     22 - SciFi
     23  - Need to actually test whether the transporting fibre will scintillate
     24  - Operate on the assumption it does not
     25  - If it does Peter has ordered hollow-fibre
     26  - Might be able to use a standrad fibre-optic connector
     27 - ICT
     28  - Colin has ICTs
     29  - 3-5ns rise time, so should see the short pulses but on the edge of visible and may be blurred out
     30  - 0.1V in signal per Amp in beam current
     31  - Beam would also need to be roughly symmetric, so has to be after the scatterer
    1632
    17 4. Equipment Procurement
    18  - General Update
    19 
    20 5. Alternate Beamlines
    21  - ELI Update
    22 
    23 6. Overview of Trello
     333. Overview of Trello
     34 - Reminder plan is laid out in the google doc and can be changed
    2435 - Trello: https://trello.com/invite/b/67587c515b0c69656ee78b48/ATTIe86f94b24e3e5884e4cb87e5ed3b89ab64321B83/poplar
    2536 - Planning next SCAPA Document: https://docs.google.com/document/d/1OTARVtxhLRu02S6CLdRDB2QlGvCqDfZ3aWBifjIFs_Q/edit?usp=sharing
    2637
    27 7. DoNM
     384. DoNM
    2839 - 23/07/26
    2940
    30 8. AoB
     415. AoB
    3142
    3243