LhARA Radiobiology Meeting: 15Oct26; 14:00 BST
ZOOM: https://imperial-ac-uk.zoom.us/j/98220889714?pwd=SM90vOF7BKSXoU3mD9q7OwBQo4IVB3.1
- Planning Document: https://docs.google.com/document/d/1OTARVtxhLRu02S6CLdRDB2QlGvCqDfZ3aWBifjIFs_Q/edit?tab=t.0
Attended: CW, WS, FA, MD, JMcG, SdL, KL, CD
Meeting Notes
- Alternate Beamlines
- ELI proposal:
- Calvin has put together a draft document
- Will share it with the relevant people
- (Not aiming for the 20th October deadline)
- ELI proposal:
- BioPrep
- Update from SCAPA that February is too early
- June 27th is when SCAPA is expecting to run protons again
- Realistically, this means "summer"
- Continue with the same plan for cells rather than delay
- June 27th is when SCAPA is expecting to run protons again
- Colin may be in Birmingham sometime this month so could transport the cells
- Update after this weekend
- Update from RadioBio meeting
- Draft paper based on Josie's technical note
- X-ray machine currently broken so Colin has not yet seen it.
- Not yet
- Update from SCAPA that February is too early
- Instrumentation
- RCF
- No Update
- SciFi
- Update: Base fine-tuning.
- Thin wall ion chamber and Diamond detector
- No Update
- Air fluorescence
- Colin discussed this more with Narender?
- Waiting for a full plan and time first
- Colin discussed this more with Narender?
- RCF
- SCAPA
- Updates
- Could look at the full beamline to improve and move things around
- Make edits to the carousel etc
- Need to learn about the experiment we are parasiting off so that we know what the setup will be.
- Updates
- Review Trello: https://trello.com/invite/b/67587c515b0c69656ee78b48/ATTIe86f94b24e3e5884e4cb87e5ed3b89ab64321B83/poplar
- DoNM
- 29/10/26
- AoB
- LhARA/CLF Workshop!!!
Summary of actions required
In-Beam Diagnostics
- Unassigned: Acquire a glass sheet
- Unassigned: Get a new RCF batch and calibrate
- TP: Testing a free sample of a new film
- SdL: Simulate energy deposited in transport fibres
- KL, CD, JMcG, SdL: Design a system to make full scifi prototypes
- KL, CD, JMcG, SdL: Make a full scifi prototype
- KL, CD, JMcG, SdL: Discuss visit to Birmingham to test SciFi
- RW, CD: Study the correlation between laser diagnostics and mean dose
- CW: Investigate the feasibility of ICTs for our beamline
- MH: Investigate LET detector
- CW: Ask Narender about air fluorescence implementation (Waiting for a full plan)
- JMcG: Investigate using IF as a dosimeter
- RH: Present about thin wall and diamond detectors at a Tuesday meeting
Bio Next Steps
- EM, CD, JMcG: Write up technical summary of Phase 2
- EM, MB, RA, JMcG: Write up a biology plan for a 2 PMQ setup
- CW, MB, RA: Obtain an inverted microscope
- RW: Obtain a thermostat for the incubator
- EM, JMcG: Send cells to Rosh and Marie
- EM, MB, RA, JMcG: Run controls to examine how long the cells can survive vertically
- MB, RA: Test transwells with x-rays
- CW: X-ray beam unflatenner
Beamline Modelling
- CD: Examine energy spectra variation
- JMcG, ED: Discuss spectra fits and SCAPA source divergence
- SdL: Investigating secondary particles in the beamline
Alternate Beamlines
- JMcG: Simulate BELLA
- JMcG: Simulate ELI
Last modified
10 days ago
Last modified on Oct 15, 2026, 2:58:03 PM
Note:
See TracWiki
for help on using the wiki.
