LARA CDR Meeting 16th October 2018
Meeting details
14:00 Room 532
Phone details:
UK: 08082 380274 Austria: 0800 006612 PIN: 5904750902
Full list of telephone contacts may be found here.
Agenda:
- Introduction and status of preparation of 'reference' proposal: KL
- End-station siultation update: AK, HT
- Implications and next steps: All
- AoB
Notes:
Present: JPo, GB, VB, CH, KL, AK, OE, JPa
- Introduction and status of preparation of 'reference' proposal: KL
- Updated reference proposal still needs to be revised. This will be completed and posted for reference.
- Goal for this meeting is to assess and agree the end-station specification and then re-evaluate the next steps.
- End-station siultation update: AK, HT
- Drawing of elements of end-station that intercept the beam here. We discussed and agreed:
- 50micron milar for beam vacuum window (perhaps consider 50/75 micron); use MedAustron preferred cell holder; take 2mm thickness for now.
- GB will make calculation and practical test of vacuum windows of various thicknesses. Need a soak test.
- AK will bring sample holders to Imperial so that the base thickness can be measured.
- Agreed that the parameter table, especially energy lost in the end-station, will be updated by the end of the week.
- Drawing of elements of end-station that intercept the beam here. We discussed and agreed:
- Implications and next steps: All
- With the parameter table revised, next week we agree how to work towards a CDR. JPa explained that he believes the CDR should be based on the 'Hunt scheme' combined with electrostatic bends.
- AoB
- Structure of AK's talk (here) was discussed, much feedback was given(!).
Attachments (2)
-
AjitKurup-CCAP.pdf
(278.9 KB
) - added by 6 years ago.
Outline of G4 User Conference talk
- mkbakffhgnpofblm.png (19.2 KB ) - added by 6 years ago.
Download all attachments as: .zip
Note:
See TracWiki
for help on using the wiki.