| 34 |   | '''Apologies:'''  | 
          
          
            |   | 34 | '''Apologies:''' JPa, OE | 
          
          
            |   | 35 |  | 
          
          
            |   | 36 | 1. __Introduction: **//KL//**__ | 
          
          
            |   | 37 |  * The five-yeara plan for MedAustron produced by MUW/TUW/MedAustron has the SmartPhantom work scheduled in.  The first exposure where we can be involved is October.  Need to be ready.  This places a spotlight on, e.g., the SmartPhanton preparations. | 
          
          
            |   | 38 |  * Some news from discussions before Christmas.  KL made a visit to GSI and discussed with colleagues there.  There are opportunities to expand our collaborative radiobiology activities.  In addition, GSI is organising a meeting on new directions in radiobiology, KL submitted an abstract to this just before Christmas. | 
          
          
            |   | 39 |  * We've submitted several other abstracts: AK ot PTCOG and JPa to IPAC.  We need to post these on the wiki. | 
          
          
            |   | 40 |  * Discussions with the Vice Dean indicate that we should prioritise drafting a i/p to the EPSRC call for 'Big Ideas'.  KL will draft and circulate for comment. | 
          
          
            |   | 41 |  * At these meetings (i.e. LARA CDR), KL proposed an increased emphasis on the h/w and prototyping projects (Gabor lens, SciWire and SmartPhantom).  This should go in parallel to the development of the CDR for LARA. | 
          
          
            |   | 42 | 1. __Notes on last meeting and actions arising: **//All//**__ | 
          
          
            |   | 43 |  * **AK:** Prepare strawman SciWire schedule. | 
          
          
            |   | 44 |   * **Stands.**  | 
          
          
            |   | 45 | 1. __Progress; comparison to schedule: **//AK//**__ | 
          
          
            |   | 46 |  * AK requested spreadsheets from CH and KL so that he can produce the overview schedule (**action: KL, CH**). | 
          
          
            |   | 47 |  * SciWire/SmartPhantom update:  | 
          
          
            |   | 48 |   * Showcase workshop will be 19Mar19 in SAF.  Need to invite people from low-energy ion-beam facilities and manufacturers.  All are invited to provide i/p to AK. | 
          
          
            |   | 49 |    * JPo volunteered: GSI: Peter Forck (Beam Diag) and Marco Durante.   | 
          
          
            |   | 50 |   * AK will prepare schedule to end of March; focus at the moment is on the jig for winding. | 
          
          
            |   | 51 |  * CDR: | 
          
          
            |   | 52 |   * KL is late with the completion of the introduction.  No one else is late (yet). | 
          
          
            |   | 53 |   * JPo/JPa had a discussion on the next steps.  Parameters have been agreed.  Risk mitigation possibilities for Gabor-lens failure have been considered.  Could use DC or pulsed solenoids, warm or SC, or HTSC.  Could be a project with Oxford Instruments. No technical reason to drive us to addopt SC/HTSC. | 
          
          
            |   | 54 |  * Gabor lens: | 
          
          
            |   | 55 |   * So far preparation conforms to the schedule. | 
          
          
            |   | 56 | 1. __Parameter table update for Gabor Lens and transport: **//KL//**__ | 
          
          
            |   | 57 |  * Started to enter the parameters, then got pulled away.  Will be done asap. | 
          
          
            |   | 58 | 1. __Gabor lens recommissioning update: **//CH//**__ | 
          
          
            |   | 59 |  * Lens is now in the conditioning phase. Vacuum pumping began early in December and continued over Christmas.  Pressure is still dropping slowly (has reached 2.9E-6mBar). | 
          
          
            |   | 60 |  * Strategy is to condition with HV/current and then add instrumentation.  A second round of leak checking will be performed when in the various stages of reassembly. | 
          
          
            |   | 61 |  * Radiation protection discussions have started.  X-ray emission needs to be quantified.   | 
          
          
            |   | 62 |  * Wish to do a visual inspection to seek explanation for small number of breakdowns during commissioning. | 
          
          
            |   | 63 |  * Paper on previous measurements in preparation.  Expect update on the document in the next weeks. | 
          
          
            |   | 64 | 1. __LARA CDR skeleton: update: **//All//**__ | 
          
          
            |   | 65 |  * Noted above.  KL needs to finish introduction and then work shoudl begin on the more meaty sections. | 
          
          
            |   | 66 | 1. __Next steps:  **//All//**__ | 
          
          
            |   | 67 |  * The preparation of a more detailed simulation of SmartPhantom is now important. Need to interface with HT.  Goal is to be complete for October. | 
          
          
            |   | 68 | 1. __AoB__ | 
          
          
            |   | 69 |  * We agreed to meet fortnightly.   |