Changes between Version 1 and Version 2 of Research/DesignStudy/Meetings/2019-02-19-LARA


Ignore:
Timestamp:
Feb 16, 2019, 2:44:22 PM (6 years ago)
Author:
longkr
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • Research/DesignStudy/Meetings/2019-02-19-LARA

    v1 v2  
    1 = Test =
     1= LARA CDR Meeting 19^th^ February 2019 =
     2
     3== Meeting details ==
     4
     514:00 GMT Room 532
     6
     7Phone details:
     8{{{
     9UK: 08082 380274
     10Austria: 0800 006612
     11
     12PIN: 5904750902
     13
     14}}}
     15
     16Full list of telephone contacts may be found [raw-attachment:Z0-Phone-details.pdf here].
     17
     18== Agenda: ==
     19
     201. __Introduction: **//AK//**__
     211. __Notes on last meeting and actions arising: **//All//**__
     221. __Progress; comparison to schedule: **//AK//**__
     231. __Space-charge simulation update: **//JPo et al.//**
     241. __Optics design update: **//JPa//**
     251. __Parameter table update for Gabor Lens and transport: **//KL//**__
     261. __Gabor lens recommissioning update: **//CH//**__
     271. __LARA CDR skeleton: update: **//All//**__
     281. __SmartPhantom preparation update: **//HTL//**
     291. __SoI to STFC -- discussion: **//All//**
     301. __AoB__
     31
     32== Notes: ==
     33
     34'''Present:'''
     35
     36'''Apologies:'''
     37
     381. __Introduction: **//AK//**__
     391. __Notes on last meeting and actions arising: **//All//**__
     401. __Progress; comparison to schedule: **//AK//**__
     411. __Space-charge simulation update: **//JPo et al.//**
     421. __Optics design update: **//JPa//**
     431. __Parameter table update for Gabor Lens and transport: **//KL//**__
     441. __Gabor lens recommissioning update: **//CH//**__
     451. __LARA CDR skeleton: update: **//All//**__
     461. __SmartPhantom preparation update: **//HTL//**
     471. __SoI to STFC -- discussion: **//All//**
     481. __AoB__
     49
     50=== Summary of actions ===