Changes between Initial Version and Version 1 of Research/DesignStudy/Meetings/2019-03-05-LhARA


Ignore:
Timestamp:
Mar 5, 2019, 9:13:42 AM (6 years ago)
Author:
longkr
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • Research/DesignStudy/Meetings/2019-03-05-LhARA

    v1 v1  
     1= LhARA CDR Meeting 5^th^ March 2019 =
     2
     3== Meeting details ==
     4
     512:00 GMT Room 532
     6
     7Phone details:
     8{{{
     9UK: 08082 380274
     10Austria: 0800 006612
     11
     12PIN: 5904750902
     13
     14}}}
     15
     16Full list of telephone contacts may be found [raw-attachment:Z0-Phone-details.pdf here].
     17
     18== Agenda: ==
     19
     201. __Introduction: **//AK//**__
     21 * __[[raw-attachment:LARA-STFC-SOI-d0.1.pdf|SoI to STFC]] -- submitted.  ASB meets Friday 08Mar19.
     221. __Space-charge simulation update: **//JPo et al.//**
     231. __Gabor lens recommissioning update: **//CH//**__
     241. __LhARA update; preparation for presentation to JAI AB: **//All//**__
     251. __SmartPhantom preparation update: **//HTL//**
     261. __Progress; comparison to schedule: **//AK//**__
     271. __AoB__
     28
     29== Notes: ==
     30
     31'''Present: '''
     32
     33'''Apologies: '''
     34
     351. __Introduction: **//AK//**__
     36 * __[[raw-attachment:LARA-STFC-SOI-d0.1.pdf|SoI to STFC]] -- submitted.  ASB meets Friday 08Mar19.
     371. __Space-charge simulation update: **//JPo et al.//**
     381. __Gabor lens recommissioning update: **//CH//**__
     391. __LhARA update; preparation for presentation to JAI AB: **//All//**__
     401. __SmartPhantom preparation update: **//HTL//**
     411. __Progress; comparison to schedule: **//AK//**__
     421. __AoB__
     43
     44=== Summary of actions ===