  • Research/DesignStudy/Meetings/2019/07-25

    v7 v8  
    1313
    14143. Layout, footprint, and infrastructure: JPo
    15  * [raw-attachment:LhARA–CAD SCHEME.pptx Slides] prepared by L.Clarke (RAL) in consultation with JPo were presented.  Good progress on the outline of the footprint.
     15 * [raw-attachment:LhARA–CAD-SCHEME.pptx Slides] prepared by L.Clarke (RAL) in consultation with JPo were presented.  Good progress on the outline of the footprint.
    1616 * We noted a number of issues; the transfer line into and out of the FFA, the size of the building, the absense of cavities in the ring.
    1717 * We also noted the absense of a shielding calculation.  A guess of 0.5m shielding has been made (new [raw-attachment:LhARA–CAD-SCHEME-2.pptx slides] provided by LC after the meeting).  Seemed to those present like an over estimate.  Agreed we need a shielding calculation.