Changes between Version 5 and Version 6 of Research/DesignStudy/Meetings/2019/11-12
- Timestamp:
- Nov 15, 2019, 1:51:02 PM (5 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
Research/DesignStudy/Meetings/2019/11-12
v5 v6 54 54 * JPo: Spoke with Zulfikar re debris, differential pumping, etc. Will set up another meeting including CW. 55 55 * Floor plan layout 56 * AK: Has someone been assigned to do the CAD drawings and do we have access to the previous drawings .56 * AK: Has someone been assigned to do the CAD drawings and do we have access to the previous drawings? 57 57 * GA: Someone will be assigned soon to do the CAD drawings and the previous drawings are in RAL's database. 58 58 * KL: best not to update the drawing for the end of November as details won't be fixed.