Changes between Initial Version and Version 1 of Research/DesignStudy/Meetings/2019/11-19


Ignore:
Timestamp:
Nov 18, 2019, 9:18:55 PM (5 years ago)
Author:
kurup
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • Research/DesignStudy/Meetings/2019/11-19

    v1 v1  
     1= LhARA pre-CDR Meeting 19th Nov 2019 =
     2
     3== Meeting details ==
     4
     5Zoom details:
     6
     7 Join Zoom Meeting https://ukri.zoom.us/j/865262978
     8
     9 Phone one-tap:
     10 United Kingdom: +442034815237!,,865262978# or +442039663809!,,865262978#
     11
     12 Join by Telephone For higher quality, dial a number based on your current location.
     13    United Kingdom:
     14      +44 203 481 5237\\
     15      +44 203 966 3809\\
     16      +44 131 460 1196\\
     17      +44 203 051 2874
     18 Meeting ID: 865 262 978
     19
     20 Join from an H.323/SIP room system H.323: 162.255.37.11 (US West) 162.255.36.11 (US East) 221.122.88.195 (China) 115.114.131.7 (India) 213.19.144.110 (EMEA) 103.122.166.55 (Australia) 209.9.211.110 (Hong Kong) 64.211.144.160 (Brazil) 69.174.57.160 (Canada) 207.226.132.110 (Japan)
     21 Meeting ID: 865 262 978
     22
     23
     24 International numbers https://ukri.zoom.us/u/ap9aBI2Eh
     25
     26 SIP: 865262978@zoomcrc.com \\
     27 Skype for Business (Lync) https://ukri.zoom.us/skype/865262978 \\
     28 Skype on a SurfaceHub SIP: 865262978@lync.zoom.us https://ukri.zoom.us/skype/865262978
     29
     30
     31== Agenda ==
     32 * Action items from last meeting.
     33        * JPo, CW, ZN and OE to meet to discuss details at the laser/proton capture interface.
     34        * AK to update the interfaces documents to clarify areas where there are overlaps in the components.
     35        * AK to clarify on the wiki what needs to be delivered for 29/11/19.
     36        * AK to ask ZN and OE to specify total footprint of the laser and shielding requirements.
     37        * AK to add solenoid details (from the GPT input file) to the parameter list document.
     38        * AK to discuss with JPas what parameters should go in the parameter table for the beam transport.
     39        * AK to note the instrumentation requirements for the definition of the baseline.
     40        * AK to add details of the steering group meetings to the wiki.
     41 * System updates.
     42  * Laser driven proton and ion source.
     43  * Proton and ion capture.
     44  * Stage 1 beam transport: Beam transport and delivery to the in vitro end station.
     45  * Stage 2 beam transport: Post-acceleration and beam delivery to the in vivo end station.
     46  * Biological end stations.
     47  * Infrastructure and Integration.
     48  * Project plan for the delivery of LhARA.
     49  * Safety.
     50  * End-to-end simulation.
     51  * Instrumentation.
     52 * A.O.B.
     53
     54== Notes ==
     55Present:
     56
     57== Action Items ==