Changes between Version 1 and Version 2 of Research/DesignStudy/Meetings/2019/11-26


Ignore:
Timestamp:
Nov 26, 2019, 1:49:36 PM (5 years ago)
Author:
kurup
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • Research/DesignStudy/Meetings/2019/11-26

    v1 v2  
    4242 * [https://ccap.hep.ph.ic.ac.uk/trac/raw-attachment/wiki/Research/DesignStudy/PreCDR/2019-11-05-WBS.pdf Work breakdown structure]
    4343 * [https://ccap.hep.ph.ic.ac.uk/trac/raw-attachment/wiki/Research/DesignStudy/PreCDR/2019-11-15-Interfaces.pdf Interfaces document]
    44  * Parameter table
     44 * [raw-attachment:LhARA_parameter_list.pdf​ Parameter table]
    4545 * System updates and outstanding issues for the 29th Nov deadline.
    4646  * Laser driven proton and ion source.