LhARA pre-CDR Meeting 26th Nov 2019
Meeting details
14:00 Room 532, Blackett Lab.
Zoom details:
Join Zoom Meeting https://ukri.zoom.us/j/865262978
Phone one-tap: United Kingdom: +442034815237,,865262978# or +442039663809,,865262978#
Join by Telephone For higher quality, dial a number based on your current location.
United Kingdom:
+44 203 481 5237
+44 203 966 3809
+44 131 460 1196
+44 203 051 2874Meeting ID: 865 262 978
Join from an H.323/SIP room system H.323: 162.255.37.11 (US West) 162.255.36.11 (US East) 221.122.88.195 (China) 115.114.131.7 (India) 213.19.144.110 (EMEA) 103.122.166.55 (Australia) 209.9.211.110 (Hong Kong) 64.211.144.160 (Brazil) 69.174.57.160 (Canada) 207.226.132.110 (Japan) Meeting ID: 865 262 978
International numbers https://ukri.zoom.us/u/ap9aBI2Eh
SIP: 865262978@…
Skype for Business (Lync) https://ukri.zoom.us/skype/865262978
Skype on a SurfaceHub SIP: 865262978@… https://ukri.zoom.us/skype/865262978
Agenda
- Action items from last meeting.
- CW to arrange meeting with JPo, ZN and OE.
- AK to add solenoid details (from the GPT input file) to the parameter list document.
- AK to note the instrumentation requirements for the definition of the baseline.
- AK to update previous parameter table and circulate Overleaf link.
- OE to circulate what was done for safety case for the laser in 027.
- Floor plan updates
- Work breakdown structure
- Interfaces document
- Parameter table
- System updates and outstanding issues for the 29th Nov deadline.
- Laser driven proton and ion source.
- Proton and ion capture.
- Stage 1 beam transport: Beam transport and delivery to the in vitro end station.
- Stage 2 beam transport: Post-acceleration and beam delivery to the in vivo end station.
- Biological end stations.
- Infrastructure and Integration.
- Project plan for the delivery of LhARA.
- Safety.
- End-to-end simulation.
- Instrumentation.
- A.O.B.
- Plenary meeting talks.
Notes
Present: CW, JPas, AK, WS, GA, KL, JPar
- Action items
- CW: No response from others, will try again.
- Main issue is to determine how close to the target the first lens can be and provide options for differential pumping, shielding against activation, route out for the laser, etc.
- AK will try to arrange a meeting this week.
- CW: No response from others, will try again.
- JPas: Chris Rogers suggested using a solenoid lens to separate electrons and protons.
- Floor plan
- End stations: Only other detail is reconfiguration for 2 end stations.
- JPas: independent extraction ports for the FFA. Would affect cost.
- AK: Could increase foot print.
- AK: details of the extraction.
- Should add this on the floor plan update.
- JPas: no dispersion matching for injection into FFA.
- AK: is there any additional floor space needed for the in vivo experiments?
- JPar: The existing box on the ground floor is fine for the irradiations.
- AK: Any updates on the holding facility?
- JPar: spoke to Mark Hill, won't need much space for the holding facility. Goal is to have a small space. Shouldn't need to be included in the floor plan, can just have this as a comment in the pre-CDR.
- AK: Capture section may need to add power supplies.
- AK: Beam transport. Need details to work out floor plan.
- JPas: don't have spec for in vivo beam.
- JPar: Depends on what experiments are being done. Would like a range of beam sizes.
- JPar: to define beam specs for in vivo experiments.
- GA: Looking at expanding on the WBS. Want to see laser safety to pare down safety case from ISIS level of detail.
- KL: Need to include access.
- WBS
- JPas: Abort line should be on the floor plan.
- Parameter table
- Needs to include sufficient detail to define the baseline.
- Including details on collimators, rebunching cavities, spaces between
- CW: Should add charge density.
- JPas: and magnetic field, collimator
- AK: What would be the lowest extraction energy that would be of interest.
- JPar: 15MeV in vivo would be for very superficial tumours.
- AK: level of detail for the FFA
- JPas: Need more detail to be able to fully define the magnet such that a designer can do an engineering solution.
- AOB
- KL:
- RFI talk went well. Hopeful that we may get endorsement of the concept in the future.
- IBC have arranged a special edition of a nuclear physics journal and we have been invited to submit an abstract. Deadline early December.
- Also IPAC, PTCOG, APAC.
- AK to prepare list of the 4 abstracts needed. One abstract, 4 different "spins".
- SG meeting on Thursday. AK will present baseline design.
- AK to draft outline R&D plan and circulate for comments before Thursday.
- KL:
Action Items
- AK to note the instrumentation requirements for the definition of the baseline.
- OE to circulate what was done for safety case for the laser in 027.
- AK to arrange meeting between laser and capture WPMs.
- JPar to define beam specs for in vivo experiments.
- AK to prepare list of the 4 abstracts needed. One abstract, 4 different "spins".
- AK to draft outline R&D plan and circulate for comments before Thursday.