Version 3 (modified by 5 years ago) ( diff ) | ,
---|
LhARA pre-CDR Meeting 7th Jan 2020
Meeting details
14:00 Room 532, Blackett Lab.
Zoom details:
Join Zoom Meeting https://ukri.zoom.us/j/865262978
Phone one-tap: United Kingdom: +442034815237,,865262978# or +442039663809,,865262978#
Join by Telephone For higher quality, dial a number based on your current location.
United Kingdom:
+44 203 481 5237
+44 203 966 3809
+44 131 460 1196
+44 203 051 2874 0800 031 5717Meeting ID: 865 262 978
Join from an H.323/SIP room system H.323: 162.255.37.11 (US West) 162.255.36.11 (US East) 221.122.88.195 (China) 115.114.131.7 (India) 213.19.144.110 (EMEA) 103.122.166.55 (Australia) 209.9.211.110 (Hong Kong) 64.211.144.160 (Brazil) 69.174.57.160 (Canada) 207.226.132.110 (Japan) Meeting ID: 865 262 978
International numbers https://ukri.zoom.us/u/ap9aBI2Eh
SIP: 865262978@…
Skype for Business (Lync) https://ukri.zoom.us/skype/865262978
Skype on a SurfaceHub SIP: 865262978@… https://ukri.zoom.us/skype/865262978
Agenda
- Action items from last meeting.
- JPar to look into spot scanning beam specs for in vivo experiments.
- System updates.
- Laser driven proton and ion source.
- Proton and ion capture.
- Stage 1 beam transport: Beam transport and delivery to the in vitro end station.
- Stage 2 beam transport: Post-acceleration and beam delivery to the in vivo end station.
- Biological end stations.
- Infrastructure and Integration.
- Project plan for the delivery of LhARA.
- Safety.
- End-to-end simulation.
- Instrumentation.
- A.O.B.
Notes
Participants: KL, WS, AK, HTL, JPoz, CW, JPas
Apologies: JT, GA
- Action items
- JPar to look at spot scanning.
- Trying to arrange a date to meet Karen. Could be Feb.
- Spot scanning may not be necessary, can do many things with passive scattered.
- KL: Energy too low to passively scatter.
- KL: For microbeams:
- Ideally like to get back to laser target spot size. ~70 micron.
- Other people do few hundred microns width beams.
- Discussion re fixing spot size for spot scanning.
- Choose 100 micron spot size for scanning.
- JPar to look at spot scanning.
- System updates
- Capture.
- Summary of discussion on 20th Dec.
- Calculations from Colin on differential pumping.
- Prelim calculations show can have 2 orders of magnitude pressure differential.
- Need to include investigating this experimentally into the R&D plan.
- CW spoke to Bob Bingham who is interested in the lens.
- Beam transport
- BDSIM model updated to include all features. Most of Stage 2 parts are there only as placeholders, waiting for physics design to be finalised.
- Looked at countering space charge by neutralising more at the start to improve transmission.
- Include phase rotation/bunch compression RF cavities.
- JPas: I can provide bunch length at extraction and energy spread.
- JPoz: I can then work out voltages and drifts.
- End stations
- Going over floor plan.
- Second end station will be incorporated.
- WS to send JPar snapshot of beamline.
- Meeting with Birmingham re FLASH irradiations. They will set up a FLASH R&D facility and hope to start irradiations end of Jan to early Feb.
- AK: Have they done anything on dosimetry.
- Not yet.
- KL: Tim Greenshaw is giving a seminar in Birmingham.
- Going over floor plan.
- Capture.
- AOB
- Schedule and costing from KL.
- KL to circulate the project and request WPMs to update their parts.
- JPas: deadline for APAC on 9th.
- IOP HEPP and PAB meetings, need to submit abstract by 24th Jan.
- Schedule and costing from KL.
Action items
- WS to send JPar snapshot of beamline.
Attachments (2)
- 2019-12-17-LhARA-5yr-WAG.pdf (54.5 KB ) - added by 5 years ago.
- 2019-12-19-StrawMan.pdf (21.2 KB ) - added by 5 years ago.
Download all attachments as: .zip