wiki:Research/DesignStudy/Meetings/2020/2020-01-07

LhARA pre-CDR Meeting 7th Jan 2020

Meeting details

14:00 Room 532, Blackett Lab.

Zoom details:

Join Zoom Meeting https://ukri.zoom.us/j/865262978

Phone one-tap: United Kingdom: +442034815237,,865262978# or +442039663809,,865262978#

Join by Telephone For higher quality, dial a number based on your current location.

United Kingdom:

+44 203 481 5237
+44 203 966 3809
+44 131 460 1196
+44 203 051 2874 0800 031 5717

Meeting ID: 865 262 978

Join from an H.323/SIP room system H.323: 162.255.37.11 (US West) 162.255.36.11 (US East) 221.122.88.195 (China) 115.114.131.7 (India) 213.19.144.110 (EMEA) 103.122.166.55 (Australia) 209.9.211.110 (Hong Kong) 64.211.144.160 (Brazil) 69.174.57.160 (Canada) 207.226.132.110 (Japan) Meeting ID: 865 262 978

International numbers https://ukri.zoom.us/u/ap9aBI2Eh

SIP: 865262978@…
Skype for Business (Lync) https://ukri.zoom.us/skype/865262978
Skype on a SurfaceHub SIP: 865262978@… https://ukri.zoom.us/skype/865262978

Agenda

  • Action items from last meeting.
    • JPar to look into spot scanning beam specs for in vivo experiments.
  • System updates.
    • Laser driven proton and ion source.
    • Proton and ion capture.
    • Stage 1 beam transport: Beam transport and delivery to the in vitro end station.
    • Stage 2 beam transport: Post-acceleration and beam delivery to the in vivo end station.
    • Biological end stations.
    • Infrastructure and Integration.
    • Project plan for the delivery of LhARA.
    • Safety.
    • End-to-end simulation.
    • Instrumentation.
  • A.O.B.

Notes

Participants: KL, WS, AK, HTL, JPoz, CW, JPas
Apologies: JT, GA

  • Action items
    • JPar to look at spot scanning.
      • Trying to arrange a date to meet Karen. Could be Feb.
      • Spot scanning may not be necessary, can do many things with passive scattered.
      • KL: Energy too low to passively scatter.
      • KL: For microbeams:
        • Ideally like to get back to laser target spot size. ~70 micron.
        • Other people do few hundred microns width beams.
      • Discussion re fixing spot size for spot scanning.
        • Choose 100 micron spot size for scanning.
  • System updates
    • Capture.
      • Summary of discussion on 20th Dec.
      • Calculations from Colin on differential pumping.
        • Prelim calculations show can have 2 orders of magnitude pressure differential.
        • Need to include investigating this experimentally into the R&D plan.
      • CW spoke to Bob Bingham who is interested in the lens.
    • Beam transport
      • BDSIM model updated to include all features. Most of Stage 2 parts are there only as placeholders, waiting for physics design to be finalised.
      • Looked at countering space charge by neutralising more at the start to improve transmission.
      • Include phase rotation/bunch compression RF cavities.
        • JPas: I can provide bunch length at extraction and energy spread.
        • JPoz: I can then work out voltages and drifts.
    • End stations
      • Going over floor plan.
        • Second end station will be incorporated.
        • WS to send JPar snapshot of beamline.
        • Meeting with Birmingham re FLASH irradiations. They will set up a FLASH R&D facility and hope to start irradiations end of Jan to early Feb.
        • AK: Have they done anything on dosimetry.
          • Not yet.
        • KL: Tim Greenshaw is giving a seminar in Birmingham.
  • AOB
    • Schedule and costing from KL.
      • KL to circulate the project and request WPMs to update their parts.
    • JPas: deadline for APAC on 9th.
    • IOP HEPP and PAB meetings, need to submit abstract by 24th Jan.

Action items

  • WS to send JPar snapshot of beamline.
Last modified 5 years ago Last modified on Jan 13, 2020, 9:43:54 PM

Attachments (2)

Download all attachments as: .zip

Note: See TracWiki for help on using the wiki.