Changes between Version 2 and Version 3 of Research/DesignStudy/Meetings/2020/2020-01-14


Ignore:
Timestamp:
Jan 14, 2020, 1:47:30 PM (5 years ago)
Author:
kurup
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • Research/DesignStudy/Meetings/2020/2020-01-14

    v2 v3  
    4242  * Stage 2 beam transport: Post-acceleration and beam delivery to the in vivo end station.
    4343  * Biological end stations.
    44    * [https://ccap.hep.ph.ic.ac.uk/trac/raw-attachment/wiki/Research/DesignStudy/PreCDR/In%20vitro%20end%20station%20floor%20plan%20v2.docx Version 2 of the in virto floor plan.]
     44   * [https://ccap.hep.ph.ic.ac.uk/trac/raw-attachment/wiki/Research/DesignStudy/PreCDR/In%20vitro%20end%20station%20floor%20plan%20v2.docx Version 2 of the in vitro floor plan.]
    4545  * Infrastructure and Integration.
    4646  * Project plan for the delivery of LhARA.