| 56 | * Laser |
| 57 | * Input beam produced by HTL. Try to get OE to take a look and ask about progress with 3D simulations. |
| 58 | * Capture |
| 59 | * JPo: Will get different focal points for both solenoids and Gabor lens when using a beam with an energy spread. |
| 60 | * JPas: will calculate electric field matrix for Gabor lens. |
| 61 | * CW: more work on electric field modelling. Looking at breakdown, current design should be resistant. |
| 62 | * CW: differential pumping calculations updated now have 3 orders of magnitude pressure drop. Need to get input from the laser guys. |
| 63 | * CW to circulate document. |
| 64 | * Beam transport |
| 65 | * JPas has updated the stage 1 lattice. |
| 66 | * Simulation files have been updated to include 5cm without space charge and 5cm with space charge and then run in BDSIM and GPT. |
| 67 | * Rebunching cavities for stage 1: |
| 68 | * 1st cavity is for phase rotation. |
| 69 | * Collimator between lenses 3 and 4. |
| 70 | * 2nd is for rebunching after lens 4. (to rotate and shorten bunch). |
| 71 | * R&D plan due in 2 weeks. AK will circulate the Initial draft. |