Changes between Version 2 and Version 3 of Research/DesignStudy/Meetings/2020/2020-02-04


Ignore:
Timestamp:
Feb 10, 2020 10:24:49 PM (4 years ago)
Author:
kurup
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • Research/DesignStudy/Meetings/2020/2020-02-04

    v2 v3  
    5353
    5454== Notes ==
    55 Participants:
     55Participants: AK, JPas, WS, HTL, GA, JPar, SGre, CW\\
     56Apologies: JM
     57
     58 * Action items from last meeting.
     59  * JPas to send AK beta and alpha as a function of S (calculated by BeamOptics).
     60   * stands
     61 * System updates
     62  * Laser
     63   * OE has added text to the pre-CDR.
     64  * Capture
     65   * Update on R&D plan.
     66  * Beam transport
     67   * See Stage 1 plots.
     68   * Progress on the injection line.
     69  * End stations
     70   * JPar: redesigned floor plan but will finalise after stage 2 end station position is fixed.
     71   * JPar: trying to get input from Manchester.  Will visit next Thursday.
     72   
     73  * Integration
     74   * Slides from Simeon.
     75    * Beam line has been updated.
     76   * JPar: is the loading bay fixed? Might need more preparation space for in vivo end station.
     77 * Outline of the pre-CDR.
     78  * Link to the document has been circulated.
     79 * R&D plan and schedule.
     80  * Will follow up individually to collate detail on this.
     81 * A.O.B.
     82  * Following meetings will be at 2pm.
     83 
    5684
    5785== Action items ==
     86  * JPas to send AK beta and alpha as a function of S (calculated by BeamOptics).
    5887
    5988