wiki:Research/DesignStudy/Meetings/2020/2020-02-04

LhARA pre-CDR Meeting 4th Feb 2020

Meeting details

15:00 Room 532, Blackett Lab.

Zoom details:

Join Zoom Meeting https://ukri.zoom.us/j/865262978

Phone one-tap: United Kingdom: +442034815237,,865262978# or +442039663809,,865262978#

Join by Telephone For higher quality, dial a number based on your current location.

United Kingdom:

+44 203 481 5237
+44 203 966 3809
+44 131 460 1196
+44 203 051 2874 0800 031 5717

Meeting ID: 865 262 978

Join from an H.323/SIP room system H.323: 162.255.37.11 (US West) 162.255.36.11 (US East) 221.122.88.195 (China) 115.114.131.7 (India) 213.19.144.110 (EMEA) 103.122.166.55 (Australia) 209.9.211.110 (Hong Kong) 64.211.144.160 (Brazil) 69.174.57.160 (Canada) 207.226.132.110 (Japan) Meeting ID: 865 262 978

International numbers https://ukri.zoom.us/u/ap9aBI2Eh

SIP: 865262978@…
Skype for Business (Lync) https://ukri.zoom.us/skype/865262978
Skype on a SurfaceHub SIP: 865262978@… https://ukri.zoom.us/skype/865262978

Agenda

  • Action items from last meeting.
    • JPas to send AK beta and alpha as a function of S (calculated by BeamOptics).
  • System updates.
    • Laser driven proton and ion source.
    • Proton and ion capture.
    • Stage 1 beam transport: Beam transport and delivery to the in vitro end station.
    • Stage 2 beam transport: Post-acceleration and beam delivery to the in vivo end station.
    • Biological end stations.
    • Infrastructure and Integration.
    • Project plan for the delivery of LhARA.
    • Safety.
    • End-to-end simulation.
    • Instrumentation.
  • Outline of the pre-CDR.
  • R&D plan and schedule.
  • A.O.B.

Notes

Participants: AK, JPas, WS, HTL, GA, JPar, SGre, CW
Apologies: JM

  • Action items from last meeting.
    • JPas to send AK beta and alpha as a function of S (calculated by BeamOptics).
      • stands
  • System updates
    • Laser
      • OE has added text to the pre-CDR.
    • Capture
      • Update on R&D plan.
    • Beam transport
      • See Stage 1 plots.
      • Progress on the injection line.
    • End stations
      • JPar: redesigned floor plan but will finalise after stage 2 end station position is fixed.
      • JPar: trying to get input from Manchester. Will visit next Thursday.

  • Integration
    • Slides from Simeon.
      • Beam line has been updated.
    • JPar: is the loading bay fixed? Might need more preparation space for in vivo end station.
  • Outline of the pre-CDR.
    • Link to the document has been circulated.
  • R&D plan and schedule.
    • Will follow up individually to collate detail on this.
  • A.O.B.
    • Following meetings will be at 2pm.

Action items

  • JPas to send AK beta and alpha as a function of S (calculated by BeamOptics).

Last modified 4 years ago Last modified on Feb 10, 2020 10:24:49 PM

Attachments (3)

Download all attachments as: .zip