    5353== Notes ==
    54 Participants: \\
    55 Apologies:   
     54Participants: AK, HTL, WS, KL, JM, GA, SGre, CW\\
     55Apologies: JPas
     56
     57 * Action items
     58  * JPas to send AK beta and alpha as a function of S (calculated by BeamOptics).
     59   * Stands.
     60 * System updates
     61  * Capture
     62   * CW: Will try to arrange meeting with Juergen.
     63   * KL: Student will be done with lectures soon and can then start working on this.
     64   * AK: arrange phone call with Colin, etc.
     65  * Beam transport.
     66   * Stage 1 simulations see plots.
     67   * HTL: New solution for the transfer line to the in vivo end station. Can provide 1-3cm and down to 1mm.
     68  * Infrastructure and integration
     69   * Slides from SGre.
     70   * Costing.
     71    * No running costs.
     72    * Installation and commissioning costs should be included.
     73   * Schedule should not include running time for stage 2.
     74  * Instrumentation.
     75   * AK and JM met on Friday to discuss what instrumentation requirements are and what should go into the pre-CDR.
     76 * AOB
     77  * Review.
     78   * Date of the review is the 31st March.
     79   * Additional date to be fixed for JPar and Yolanda.
    5680
    5781== Action items ==
    58 
     82 * JPas to send AK beta and alpha as a function of S (calculated by BeamOptics).