Changes between Version 2 and Version 3 of Research/DesignStudy/Meetings/2020/2020-02-25


Ignore:
Timestamp:
Mar 2, 2020 1:57:58 PM (4 years ago)
Author:
kurup
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • Research/DesignStudy/Meetings/2020/2020-02-25

    v2 v3  
    5757
    5858== Notes ==
     59
     60Participants: AK, WS, HTL, TD, KL, CW, GA, JM, JPas
     61
     62 * Previous action items
     63  * AK to arrange meeting with OE and ZN to discuss R&D plan and write up.
     64  * GA to circulate template spreadsheet for costing to WPMs.
     65  * AK to circulate detailed R&D plan and schedule.
     66 * System updates
     67  * Laser.
     68   * Section in pre-CDR needs updating. AK will meet OE on Friday to discuss.
     69  *  Capture.
     70   * No update yet.
     71  * Beam transport
     72   * Need to decide on which design, GL+Octopole or GL+quads.
     73   * Discuss on Friday at 1pm.
     74   * Stage 2
     75    * HTL: Still have small beta in the transfer line. See attachment.
     76  * Infrastructure and Integration - GA
     77   * Started writing section for the pre-CDR in Overleaf.
     78   * Costing
     79    * Circulated template costing.
     80    * Have put in best guess numbers. Need input from WPMs.
     81    * Need better estimate for the Gabor lens.
     82    * KL: Is costing capital or include staff. GA: Mainly capital.
     83  * Instrumentation - JM
     84   * FFA
     85    * Destructive profile measurement at injection and extraction.
     86    * JPas: BPM in FFA uses pickups over the aperture. Used to measure the tune.
     87    * Add R&D for instrumentation.
     88   * AK will give feedback on what has been written so far.
     89
     90 * R&D plan and schedule.
     91  * WPMs to check the plan.
     92
     93
     94 * AOB
     95  * KL: Will circulate terms of reference for the review.
     96
     97== Action items ==
     98 * KL to circulate terms of reference for the review.
    5999 
    60100