Version 4 (modified by 5 years ago) ( diff ) | ,
---|
LhARA pre-CDR Meeting 25th Feb 2020
Meeting details
14:00 Room 532, Blackett Lab.
Zoom details:
Join Zoom Meeting https://ukri.zoom.us/j/865262978
Phone one-tap: United Kingdom: +442034815237,,865262978# or +442039663809,,865262978#
Join by Telephone For higher quality, dial a number based on your current location.
United Kingdom:
+44 203 481 5237
+44 203 966 3809
+44 131 460 1196
+44 203 051 2874 0800 031 5717Meeting ID: 865 262 978
Join from an H.323/SIP room system H.323: 162.255.37.11 (US West) 162.255.36.11 (US East) 221.122.88.195 (China) 115.114.131.7 (India) 213.19.144.110 (EMEA) 103.122.166.55 (Australia) 209.9.211.110 (Hong Kong) 64.211.144.160 (Brazil) 69.174.57.160 (Canada) 207.226.132.110 (Japan) Meeting ID: 865 262 978
International numbers https://ukri.zoom.us/u/ap9aBI2Eh
SIP: 865262978@…
Skype for Business (Lync) https://ukri.zoom.us/skype/865262978
Skype on a SurfaceHub SIP: 865262978@… https://ukri.zoom.us/skype/865262978
Agenda
- Action items from last meeting.
- JPas to send AK beta and alpha as a function of S (calculated by BeamOptics).
- AK to arrange meeting with OE and ZN to discuss R&D plan and write up.
- GA to circulate template spreadsheet for costing to WPMs.
- AK to circulate detailed R&D plan and schedule.
- System updates.
- Laser driven proton and ion source.
- Proton and ion capture.
- Stage 1 beam transport: Beam transport and delivery to the in vitro end station.
- Stage 2 beam transport: Post-acceleration and beam delivery to the in vivo end station.
- Biological end stations.
- Infrastructure and Integration.
- Project plan for the delivery of LhARA.
- Safety.
- End-to-end simulation.
- Instrumentation.
- R&D plan and schedule.
- Writing the pre-CDR.
- A.O.B.
Notes
Participants: AK, WS, HTL, TD, KL, CW, GA, JM, JPas
- Previous action items
- AK to arrange meeting with OE and ZN to discuss R&D plan and write up. Done.
- GA to circulate template spreadsheet for costing to WPMs. Done.
- AK to circulate detailed R&D plan and schedule. Done.
- System updates
- Laser.
- Section in pre-CDR needs updating. AK will meet OE on Friday to discuss.
- Capture.
- No update yet.
- Beam transport
- Need to decide on which design, GL+Octopole or GL+quads.
- Discuss on Friday at 1pm.
- Stage 2
- HTL: Still have small beta in the transfer line. See attachment.
- Infrastructure and Integration - GA
- Started writing section for the pre-CDR in Overleaf.
- Costing
- Circulated template costing.
- Have put in best guess numbers. Need input from WPMs.
- Need better estimate for the Gabor lens.
- KL: Is costing capital or include staff. GA: Mainly capital.
- Instrumentation - JM
- FFA
- Destructive profile measurement at injection and extraction.
- JPas: BPM in FFA uses pickups over the aperture. Used to measure the tune.
- Add R&D for instrumentation.
- AK will give feedback on what has been written so far.
- FFA
- Laser.
- R&D plan and schedule.
- WPMs to check the plan.
- AOB
- KL: Will circulate terms of reference for the review.
Action items
- KL to circulate terms of reference for the review.
Attachments (1)
- 240220-LhARA-invivo-HTL.pdf (327.6 KB ) - added by 5 years ago.
Download all attachments as: .zip