Changes between Version 1 and Version 2 of Research/DesignStudy/Meetings/2020/2020-03-03


Ignore:
Timestamp:
Mar 9, 2020, 6:17:27 PM (5 years ago)
Author:
kurup
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • Research/DesignStudy/Meetings/2020/2020-03-03

    v1 v2  
    5353
    5454== Notes ==
     55Participants: JPar, CW, AK, HTL, WS, TD,KL, JMat
     56Apologies: JPas
     57
     58 * Action items
     59  * Done
     60 * Laser
     61  * AK met OE
     62   * OE believes the target R&D would take 6 months.
     63   * KL: doesn't believe this is realistic.
     64   * Other areas should be included in the R&D programme such as simulation.
     65 * Capture - CW
     66  * Discussions with Bob Bingham.
     67  * 5 years R&D probably not enough.
     68  * AK: plan has 2 years to give an answer whether the lens will work or not.
     69   * CW: Probably won't be able to find solution to correct for instabilities in this time frame.
     70  * AK: Can move decision point to before the Stage 1 TDR.
     71  * CW circulated first draft of pre-CDR section.
     72 * Beam transport - WS
     73  * Meeting on Friday to discuss two options. See slides on simulation page.
     74 * Beam transport - HTL
     75  * Updated overleaf will post-accel section and transfer line.
     76  * Simulations of the end station and text to go in the pre-CDR
     77  * For the end station look at mono-energetic beam, 15 MeV +/- 2% and the 12MeV +/- 2%.
     78  * For high energy in vitro look at 127MeV look at range in a water phantom.
     79  * Details on the transfer line to go in the pre-CDR.
     80 * End stations
     81  * Just updated the draft of the pre-CDR.
     82  * Will speak with Karen on Thursday.
     83  * Pushing on with work at Birmingham on their FLASH capabilities. Beam time allocated in April for FLASH experiments.
     84  * Oxford have FLASH electrons and would be good to collaborate with them.
     85  * Visited Rutherford Cancer Centre (sites in Reading and Newport). Plan to do experiments in the next month (not FLASH). Machines not rated to do FLASH dose rates.
     86 * Instrumentation. - JM
     87  * First draft added to Overleaf.
     88  * AK and JMat to meet on Thursday.
     89 * AOB
     90  * KL: Letter to STFC sent re our plans for LhARA.
     91 
     92