Changes between Version 2 and Version 3 of Research/DesignStudy/Meetings/2020/2020-03-10


Ignore:
Timestamp:
Mar 16, 2020, 6:07:16 PM (5 years ago)
Author:
kurup
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • Research/DesignStudy/Meetings/2020/2020-03-10

    v2 v3  
    3535 * Action items from last meeting.
    3636  * None
    37 
    3837 * System updates.
    3938  * Laser driven proton and ion source.
     
    5150 * [raw-attachment:2020-03-31-LhARA-pre-CDR-review-agenda-d1.pdf Pre-publication review of the pre-CDR.]
    5251 * A.O.B.
     52
     53== Notes ==
     54* Participants: AK, HTL, KL, TD, OE, WS, JPas, CW, GA.
     55
     56 * Status updates
     57  * laser - OE
     58   * ZN proof reading but he's on strike.
     59   * Costings being prepared.
     60  * Capture
     61   * Update in Overleaf.
     62   * Titus to add detail on diff pumping.
     63   * CW to work on the R&D part.
     64  * Beam transport - WS.
     65   * Focus has been on the write up of v4.3 as the main design and v5.3 as the alternative design.
     66   * Simulation using a more realistic beam will be done.
     67   * Ready for feedback.
     68   * AK to go over this.
     69   * JPas
     70    * Looked at tweaking 4.3 to reduced Beta from ~400 to ~50 to facilitate injection.
     71    * This change moves the focal point for collimation to where the RF cavity is.
     72    * This would increase the space needed after GL5, for octopoles, cavity and the switching dipole.
     73   * HTL
     74    * Updated Overleaf with the transfer line to in vivo.
     75    * This is more or less complete. Simulations from after RF cavity to the end station as assuming alpha=0 after extraction line.
     76    * Overleaf has many plots not included in the document. Can decide later what not to include.
     77    * Inconsistency in the BDSIM simulation being investigated.
     78    * Beta=58 coming out of extraction translates to 1cm for 15MeV, 3cm for 127MeV assuming 10x emittance growth.
     79    * AK to look at the write up on Thursday when it'll be ready.
     80  * GA
     81   * The costing has been updated based on costs from other existing facilities.
     82  * Pre-publication review of the pre-CDR - KL
     83   * Proposed agenda (see attachment) will be circulated. 
     84   * 20 minutes for each speaker should cover 10 minutes for a  presentation and 10 minutes for questions.