| | 52 | |
| | 53 | == Notes == |
| | 54 | * Participants: AK, HTL, KL, TD, OE, WS, JPas, CW, GA. |
| | 55 | |
| | 56 | * Status updates |
| | 57 | * laser - OE |
| | 58 | * ZN proof reading but he's on strike. |
| | 59 | * Costings being prepared. |
| | 60 | * Capture |
| | 61 | * Update in Overleaf. |
| | 62 | * Titus to add detail on diff pumping. |
| | 63 | * CW to work on the R&D part. |
| | 64 | * Beam transport - WS. |
| | 65 | * Focus has been on the write up of v4.3 as the main design and v5.3 as the alternative design. |
| | 66 | * Simulation using a more realistic beam will be done. |
| | 67 | * Ready for feedback. |
| | 68 | * AK to go over this. |
| | 69 | * JPas |
| | 70 | * Looked at tweaking 4.3 to reduced Beta from ~400 to ~50 to facilitate injection. |
| | 71 | * This change moves the focal point for collimation to where the RF cavity is. |
| | 72 | * This would increase the space needed after GL5, for octopoles, cavity and the switching dipole. |
| | 73 | * HTL |
| | 74 | * Updated Overleaf with the transfer line to in vivo. |
| | 75 | * This is more or less complete. Simulations from after RF cavity to the end station as assuming alpha=0 after extraction line. |
| | 76 | * Overleaf has many plots not included in the document. Can decide later what not to include. |
| | 77 | * Inconsistency in the BDSIM simulation being investigated. |
| | 78 | * Beta=58 coming out of extraction translates to 1cm for 15MeV, 3cm for 127MeV assuming 10x emittance growth. |
| | 79 | * AK to look at the write up on Thursday when it'll be ready. |
| | 80 | * GA |
| | 81 | * The costing has been updated based on costs from other existing facilities. |
| | 82 | * Pre-publication review of the pre-CDR - KL |
| | 83 | * Proposed agenda (see attachment) will be circulated. |
| | 84 | * 20 minutes for each speaker should cover 10 minutes for a presentation and 10 minutes for questions. |