Changes between Version 10 and Version 11 of Research/DesignStudy/Meetings/2021/2021-06-10-LhARA-half-day


Ignore:
Timestamp:
Jun 8, 2021, 1:47:14 PM (3 years ago)
Author:
longkr
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • Research/DesignStudy/Meetings/2021/2021-06-10-LhARA-half-day

    v10 v11  
    99 - Biology of ionising radiation; USPs for LhARA (10+5): J. Parsons
    1010
    11 2. __Proton and ion source:__ Conveners: E. Boella, K. Long
     112. //10:00--10:50// __Proton and ion source:__ Conveners: E. Boella, K. Long
    1212 - Status of simulation of laser-target interaction (15+5): HT Lau
    1313 - Progress towards 3D simulations of laser-target interactions (15+5): E. Boella
    1414 - Towards the specification of a primary beam spectrometry experiment (7+3): K. Long
    1515
    16 3. __Proton and ion capture:__ Conveners: C. Baker, C. Whyte
     16// Break to 11:15 //
     17
     183. //11:15--12:00// __Proton and ion capture:__ Conveners: C. Baker, C. Whyte
    1719 - Understanding of first Gabor lens prototype (15+5): TS Dascalu
    1820 - Development of electron plasma experimental programme at Swansea (15+5): C. Baker
    1921 - The path to a second Gabor lens prototype (10+5): C. Whyte
    2022
    21 4. __Ion-acoustic imaging:__ Conveners: B. Cox
    22  - Ion-acoustic imaging; principle, status and plans: J. McGarrigle
     234. //12:00--12:20// __Ion-acoustic imaging:__ Conveners: B. Cox
     24 - Ion-acoustic imaging; principle, status and plans (15+5): J. McGarrigle
    2325
    24 5. __Vertical beam line for biological research on the Birmingham cyclotron:__ Conveners: J. Parsons, T. Price
     265. //12:20--13:00// __Vertical beam line for biological research on the Birmingham cyclotron:__ Conveners: J. Parsons, T. Price
    2527 - Introduction and context (10+5): J. Parsons
    2628 - Ideas for a vertical beam line for biological research on the Birmingham Cyclotron (20+5): T. Price
    2729
    28 6. __Facility design and integration:__ J. Pasternak, W. Shields
     306. //13:00--13:30// __Facility design and integration:__ J. Pasternak, W. Shields
     31 - Injection into FFA (10+5): W. Shields
     32 - FFA design update (10+5): J. Pasternak
    2933
    30 7. __Discussion__
     347. //13:30// __Close__
    3135
    3236----