Changes between Version 1 and Version 2 of Research/DesignStudy/Meetings/2021/2021-12-15-CM2


Ignore:
Timestamp:
Dec 2, 2021 5:29:25 PM (2 years ago)
Author:
longkr
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • Research/DesignStudy/Meetings/2021/2021-12-15-CM2

    v1 v2  
    11= LhARA collaboration meeting 15^th^ December 2021; time to be advised =
     2
     3**ZOOM**: https://imperial-ac-uk.zoom.us/j/95462390986?pwd=VkJuUUZFWGJhZzN5UURud1UwbHloQT09 \\
     4  Meeting ID: 954 6239 0986 \\
     5  Passcode: *2Nerb
     6
     7|| **11:00** || **// Session 1: introduction and radiation biology //** ||||||
     8|| 1. || Welcome and introduction || K. Long || 5 mins ||
     9|| 2. || Radiation biology || J. Parsons, \\ Y. Prezado || 25 mins ||
     10|| **11:30** || **// Session 2a: The LhARA Programme //** ||||||
     11||    || // WP2: Laser-driven proton and ion source: E. Boella, N. Dover, R. Gray // ||||||
     12|| 1. || To be defined || T.BD || 30 mins ||
     13
     14**// 12:00: Break 1 //**
     15
     16|| **12:30** || **// Session 2b: The LhARA Programme //** ||||||
     17||     || // WP3: Proton and ion capture: W. Bertsche, M. Charlton, C. Baker // ||||||
     18|| 1. || To be defined || T.BD || 30 mins ||
     19||     || // WP4: Ion-acoustic dose mapping: J. Bamber, E. Harris, J. Matheson // ||||||
     20|| 1. || To be defined || T.BD || 30 mins ||
     21
     22**// 13:30: Break 2 //**
     23
     24|| **14:00** || **// Session 2c: The LhARA Programme //** ||||||
     25||     || // WP5: Novel end-station development: R. McLauchlan, T. Price, C. Welsche // ||||||
     26|| 1. || To be defined || T.BD || 30 mins ||
     27||     || // WP6: Design and integration: N. Bliss, J. Pasternak // ||||||
     28|| 1. || To be defined || T.BD || 30 mins ||
     29|| **15:00** || **// Session 3: Closing discussion //** ||||||
     30|| 1. || Discussion, next-steps and wrap up |||| 30 mins ||
     31
     32
    233
    334The second LhARA collaboration will take place on 15Dec21.  The agenda is presently being developed and we advised shortly.