Changes between Version 24 and Version 25 of Research/DesignStudy/Meetings/2021/2021-12-15-CM2
- Timestamp:
- Dec 15, 2021, 2:01:47 PM (3 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
Research/DesignStudy/Meetings/2021/2021-12-15-CM2
v24 v25 21 21 || **12:30** || **// Session 2b: The LhARA Programme //** |||||| 22 22 || || // WP3: Proton and ion capture: W. Bertsche, M. Charlton, C. Baker // |||||| 23 || 1. || [raw-attachment:WP3-LhARA-15Dec2021-Collaboration-Meeting-WP3-upload-slides.pdf Introduction] || M. Charlton || 3-5 mins ||23 || 1. || [raw-attachment:WP3-LhARA-15Dec2021-Collaboration-Meeting-WP3-upload-slides.pdf Introduction] || C. Baker for M. Charlton || 3-5 mins || 24 24 || 1. || Source/capture interface & Stage 1 b/l simulation || HT Lau || 2-3 mins || 25 || 1. || Measurements at Swansea and status of interpretation|| T.S. Dascalu || 3-5 mins ||25 || 1. || [raw-attachment: Measurements at Swansea and status of interpretation] || T.S. Dascalu || 3-5 mins || 26 26 || 1. || [raw-attachment:WP3-LhARA-15Dec2021-BAKER.pdf Proposal summary] || C. Baker || 5-10 mins || 27 27 || 5. || Conclusions || M. Charlton || 3-5 mins || … … 29 29 || || // WP4: Ion-acoustic dose mapping: J. Bamber, E. Harris, J. Matheson // |||||| 30 30 || 1. || Background, overview and hardware concept || J. Bamber || 5 mins || 31 || 2. || Foward modelling and dose-map reconstruction|| B. Cox || 5 mins ||31 || 2. || [raw-attachment:WP4-ionacoustics_kWave_Cox.pptx Foward modelling and dose-map reconstruction] || B. Cox || 5 mins || 32 32 || 3. || [raw-attachment:JM_151221_v2.pptx Field standard dose-measurement reference] || J. Matheson || 5 mins || 33 33 || 4. || Long-term vision for use and impact || E. Harris || 5 mins ||