Changes between Version 27 and Version 28 of Research/DesignStudy/PreCDR/Review


Ignore:
Timestamp:
Mar 29, 2020, 8:14:19 PM (4 years ago)
Author:
longkr
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • Research/DesignStudy/PreCDR/Review

    v27 v28  
    33The availability of the reviewers has dictated that the review will take place in two parts.  On the 25^th^ March 2020 a review of the radiobiological aspects of the LhARA programme will take place.  The review of the source, accelerator, instrumentation, and project aspects will take place on the 31^st^ March 2029.
    44
    5 The terms of reference for the review can be found [wiki:#Administration below].
     5The terms of reference for the review can be found [#Administration below].
    66
    77== Reviewers: ==