Changes between Version 41 and Version 42 of Research/DesignStudy/PreCDR/Review
- Timestamp:
- Mar 30, 2020, 2:33:15 PM (5 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
Research/DesignStudy/PreCDR/Review
v41 v42 36 36 ||14:40—15:00 || J. Pasternak (ICL) || Design of the LhARA accelerator facility || 37 37 ||15:00—15:20 || W. Shields (RHUL) || Simulation of LhARA ([raw-attachment:07-WShields_LhARA_Simulations.pdf PDF]) || 38 ||15:20—15:40 || J. Matheson (STFC RAL, PPD) || Instrumentation ||38 ||15:20—15:40 || J. Matheson (STFC RAL, PPD) || Instrumentation ([raw-attachment:08-Lhara_Inst_v10.pptx PPTX], [raw-attachment:08-Lhara_Inst_v10.pdf PDF]) || 39 39 ||15:40—16:00 || J. Hughes (Liverpool) || Biological end stations ([raw-attachment:09-JH-BES-preCDR-Meeting-310320-1.pptx PPTX], [raw-attachment:09-JH-BES-preCDR-Meeting-310320-1.pdf PDF]) || 40 40 ||16:00—16:20 || G. Aymar (STFC RAL, ISIS) || Infrastructure considerations ([raw-attachment:10-Aymar_LhARA_STFC_Update_20200331.pptx PPTX], [raw-attachment:10-Aymar_LhARA_STFC_Update_20200331.pdf PDF]) ||