    99An effort to develop a 'pre-CDR' has been initiated supported by the award of an STFC Opportunities 2019 award.  This page is being used to collect and share information in the preparation of the pre-CDR.
    1010
    11 ----
    12 
    1311== Key dates ==
    14 * **29Nov19**: First issue of the baseline. This will include the floor layout, WBS, Interfaces document and the parameter table.
    15 * **31Dec19**: First end-to-end tracking simulation.
    16 * **31/1/20**:
     12* **29 Nov 2019**: First issue of the baseline. This will include the floor layout, WBS, Interfaces document and the parameter table.
     13* **31 Dec 2019**: First end-to-end tracking simulation.
     14* **31 Jan 2020**:
    1715 - Design of the facility will be frozen.
    1816 - First view of the costs.
    1917 - R&D programme needed to realise LhARA and be able to write a technical design report will be defined.
    20 * **28Feb20**: Complete the write-up of the pre-CDR.
    21 * **Mar20**: External review of pre-CDR in advance of publication.
     18* **28 Feb 2020**: Complete the write-up of the pre-CDR.
     19* **Mar 2020**: External review of pre-CDR in advance of publication.
    2220
    23 ----
    2421
    25 == Project Management information ==
     22== Project management information ==
    2623
    2724* [raw-attachment:2019-11-05-WBS.pdf​ Work breakdown structure]
    2825* [raw-attachment:2019-11-05-Interfaces.pdf Definition of the system interfaces]
    2926
    30 ----
     27=== Work package managers ===
     28 ||** Work package **|| ** Manager(s) **||** Email **||
     29 || Laser driven proton and ion source || Zulfikhar Najmudin \\ Oliver Ettlinger || z.najmudin@imperial.ac.uk \\ o.ettlinger13@imperial.ac.uk
     30
     31 || Proton and ion capture
     32 || Stage 1 beam transport: Beam transport and delivery to the in vitro end station
     33 || Stage 2 beam transport: Post-acceleration and beam delivery to the in vivo end station
     34 || Biological end stations
     35 || Infrastructure and Integration
     36 || Project plan for the delivery of LhARA
     37 || Safety
     38 || End-to-end simulation
     39 || Instrumentation