Changes between Version 6 and Version 7 of Research/DesignStudy/PreCDR
- Timestamp:
- Nov 12, 2019, 11:17:52 PM (5 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
Research/DesignStudy/PreCDR
v6 v7 10 10 11 11 == Key dates == 12 * **29 Nov 2019**: First issue of the baseline. This will include the floor layout, WBS, Interfaces document and the parameter table.12 * **29 Nov 2019**: First issue of the baseline. This will include lists from the various systems of what needs to be updated on the existing floor layout, WBS, interfaces document and the parameter table. 13 13 * **31 Dec 2019**: First end-to-end tracking simulation. 14 14 * **31 Jan 2020**: … … 31 31 || Proton and ion capture || Juergen Pozimski \\ Colin Whyte || j.pozimski@imperial.ac.uk \\ colin.whyte@strath.ac.uk || 32 32 || Stage 1 beam transport: Beam transport and delivery to the in vitro end station || Jaroslaw Pasternak \\ William Shields || j.pasternak@imperial.ac.uk \\ William.Shields.2010@live.rhul.ac.uk || 33 || Stage 2 beam transport: Post-acceleration and beam delivery to the in vivo end station || Jaroslaw Pasternak || j.pasternak@imperial.ac.uk ||33 || Stage 2 beam transport: Post-acceleration and beam delivery to the in vivo end station || Jaroslaw Pasternak \\ William Shields || j.pasternak@imperial.ac.uk \\ William.Shields.2010@live.rhul.ac.uk || 34 34 || Biological end stations || Jason Parsons \\ Jonathan Hughes || J.Parsons@liverpool.ac.uk \\ Jonathan.Hughes@liverpool.ac.uk || 35 35 || Infrastructure and Integration || John Thomason \\ Galen Aymar || john.thomason@stfc.ac.uk \\ galen.aymar@stfc.ac.uk ||