Changes between Version 1 and Version 2 of Research/DesignStudy/SteeringGroup/2020-06-05


Ignore:
Timestamp:
Jun 2, 2020, 10:46:48 AM (4 years ago)
Author:
longkr
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • Research/DesignStudy/SteeringGroup/2020-06-05

    v1 v2  
    22
    33 //**5^th^ May  2020 10:00 GMT**//
    4 === Summary of actions: ===
    5  * **KL**: Set up series of meetings with leads at partner organisations to discuss preparation of R&D programme.
    6  * **KL**: Ensure that M.Dosanjh is on the relevant mailing lists and ensure she has the chance to input into the pre-CDR.
    7  * **KL**: Take forward the discussion of dedicated diagnostics to advance the state of the art in end-station diagnostics.
    8  * **KL**: Bring G.Schettino and NPL into the consortium.
    9  * **KL/CB**: Consider meeting between Imperial (and other) ion-accelerator experts with the relevant experts in CLF.
    104 
    11 
    125== Meeting details ==
    136
     
    169== Agenda: ==
    1710
    18 1. [wiki:Research/DesignStudy/PreCDR/SG/2020-02-28 Notes of last meeting and actions arising:]
    19  * **KK/JP**: Consult regarding specification of the end stations.
    20   * **Done.**
     111. [wiki:Research/DesignStudy/PreCDR/SG/2020-05-01 Notes of last meeting and actions arising:]
    2112 * **KL**: Set up series of meetings with leads at partner organisations to discuss preparation of R&D programme.
    22   * **Ongoing.**
     13 * **KL**: Ensure that M.Dosanjh is on the relevant mailing lists and ensure she has the chance to input into the pre-CDR.
     14 * **KL**: Take forward the discussion of dedicated diagnostics to advance the state of the art in end-station diagnostics.
     15 * **KL**: Bring G.Schettino and NPL into the consortium.
     16 * **KL/CB**: Consider meeting between Imperial (and other) ion-accelerator experts with the relevant experts in CLF.
    2317
    24 2. [raw-attachment:2020-05-01-SGMeeting.pdf​ Status of pre-CDR]: AK \\
     182. [raw-attachment:2020-06-05-SGMeeting.pdf​ Project Managers report: AK \\
    2519
    26 3. Pre-publication review of LhARA pre-CDR: KL \\
     203. Proposed new members of the consortium: KL \\
    2721
    28 4. Proposed new members of the consortium: KL \\
     224. Taking the programme forward; discussion: All \\
    2923
    30 5. Taking the programme forward; discussion: All \\
    31 
    32 6. DONMs \\
    33  * 05 Jun 2020; 10:00 BST
     245. DONMs \\
    3425 * 03 Jul 2020; 10:00 BST
    3526 * 04 Sep 2020; 10:00 BST