Changes between Version 7 and Version 8 of Research/DesignStudy/SteeringGroup/2020-12-11


Ignore:
Timestamp:
Dec 11, 2020, 1:24:21 PM (4 years ago)
Author:
longkr
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • Research/DesignStudy/SteeringGroup/2020-12-11

    v7 v8  
    771. **[wiki:Research/DesignStudy/SteeringGroup/2020-09-24 Notes of last meeting and actions arising:]**
    88 * **KL/CB**: Consider meeting between Imperial (and other) ion-accelerator experts with the relevant experts in CLF.
    9   -
     9  - **Superceded:** Strong engagement of CLF through C. Brenner.  Building on this going forward.
    1010 * **KL/KK**: to collaborate on the development for a proposal for multidisciplinary a meeting on the timescale of November 2020.
    11   -
     11  - **On going:** Concept has evolved into a peer group meeting on 24Jun21 in conjunction with a public Rutherford Lecture.  A small organising committee is being formed and KK has (is about to) receive the invitation.
    1212 * **KL**: Ensure one representative per group at the next LhARA SG meeting.
    1313  - **Done.**
     
    1515  - **Superceded.**
    1616 * **KL**: Write to J.Clarke to ask for support to reach out to relevant industry.
    17   -
     17  - **Stands.**
    1818 * **PA**: Make contact with MTC to see how to make contact with relevant industry.
    1919  -
     
    2323  - **Done.
    2424
    25 2. **[raw-attachment:2020-09-24-Update-Long.pptx Update on progress]: KL** \\
     252. **[raw-attachment:2020-12-11-Update-Long.pptx Update on progress]: KL** \\
     26 // To include proposal for P. Beard (UCL) to join the LhARA collaboration. //
    2627
    27283. **Raising the resources to execute the LhARA programme: All**\\