15 | | * '''WP4''' - JM presented slides - updates for Ion Acoustic Imaging. LhARA has stage 1 and stage 2 beams, each with their own properties which may require different instrumentation. Where might we test prototype instrumentation on a beam? CERN, Birmingham, Advanced Oncotherapy - to be considered. Currently looking at restarting the work on scintillating fibre detectors as a known cross-calibration for ion acoustic dose measurements. '''Next steps:''' draft out timeline of the stages or the WP and derive manpower costings. Approach industry for information on hardware costings. EH to meet with Ken, John and Jeff to get up to speed with WP4. |
| 15 | * '''WP4''' - JM presented slides - updates for Ion Acoustic Imaging. LhARA has stage 1 and stage 2 beams, each with their own properties which may require different instrumentation. Where might we test prototype instrumentation on a beam? CERN, Birmingham, Advanced Oncotherapy - to be considered. Currently looking at restarting the work on scintillating fibre detectors as a known cross-calibration for ion acoustic dose measurements. '''Next steps:''' draft out timeline of the stages or the WP and derive manpower costings. Approach industry for information on hardware costings. EH to meet with Ken, John, Jeff and Colin to get up to speed with WP4. |
| 16 | * '''WP5''' (separate meeting that took place on 20th of September) |
| 17 | * '''WP6''' - JP presented slides. Design of the main three challenging components: Gabor lens (subject of focus of the capture WP) / FFA main magnet design / MA cavity. Additional items for completion of Phase I CDR completion ( time estimated for an RA adds up to 1 FTEy). Summary: 4.5 FTEy of the RA effort in total, 3 PhD students (magnet design, MA cavity design, beam diagnostics development) + extra costs for software and materials + usual consumables. Effort for the next 3 years to be estimated. Milestones and deliverables have been identified. [KL – we need to go to accelerator centres to investigate more of what help we will need and how we could cost it.] [CW- more effort might be required on implementation] |
| 18 | |
| 19 | CW- The group is working together effectively. However, we need to be more realistic with timescales. '''30th of September – we want to be at a point of having an accuracy of 90% in costing.''' ( not inflated- but an honest estimate). A reminder of the SG meeting on the 27th of September. |
| 20 | |