Changes between Initial Version and Version 1 of Research/DesignStudy/WPMGroup/Meetings/2022/05-05WP3


Ignore:
Timestamp:
May 5, 2022, 11:20:05 AM (3 years ago)
Author:
cwhyte1
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • Research/DesignStudy/WPMGroup/Meetings/2022/05-05WP3

    v1 v1  
     1Agenda
     2
     31 Cost
     4* Travel £15k
     5
     62. Milestones
     7* M3.1 Validate plasma simulations with existing Swansea experimental set-up       Month 6
     8* M3.2 Progress report of large diameter plasma experiments and simulations        Month 18
     9* M3.3 Next generation plasma lens testbench design                                Month 24
     10* M3.4 Progress report of standalone plasma apparatus build and commissioning      Month 36
     11* M3.5 Progress report of large particle-number plasma experiments and simulations Month 48
     12* M3.6 Ion focussing results                                                      Month 60
     13* M3.7 Final plasma lens design                                                   Month 60
     14
     153. Risk
     16
     174. AOB