Changes between Version 1 and Version 2 of Research/DesignStudy/WPMGroup/Meetings/2022/11-15


Ignore:
Timestamp:
Nov 15, 2022, 4:55:13 PM (2 years ago)
Author:
cwhyte1
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • Research/DesignStudy/WPMGroup/Meetings/2022/11-15

    v1 v2  
    99
    1010JeS progress: update - CW
     11* JeS information passed from STFC to ITRF. ITRF response should allow STFC to issue award letters -
    1112
    12 LhARA Review: no update
     13LhARA Review: no update - expect more substantial discussion at next WPM meeting
    1314
    14 LhARA End station - 1st consultation 14th Dec 2022 Charing Cross
     15LhARA End station - 1st consultation 14th Dec 2022 Charing Cross.
     16* Online registration now available.
     17* Briefing document will be required 2 weeks in advance - draft for next WPM meeting?
     18 * Include beam parameters/time structure/beam size etc.
     19 * Sample container requirements
     20 * atmospheric control
     21 * Running schedule, several hours continuous. Downtime.
     22 * Also consider possible on site cell diagnostics
    1523
    16 IPAC Papers
     24IPAC Papers Absracts 7th Dec. Conf May'23.
     25* ICL preparing 'overview' paper, others considering options.
     26* Action potential authors to prepare material for consideration at next WPM meeting.
    1727
    1828