Version 2 (modified by cwhyte1, 2 years ago) (diff) |
---|
Agenda
- Costs
- Travel £26k
- Milestones
- M4.1 Geant4 simulations of bema energy deposition profile M18
- M4.2 Acoustic sensor array design M24
- M4.3 Iterative reconstruction methods M42
- M4.4 Integration:ultra-sonic array with radiobiology station M48
- M4.5 LhARA ion-acoustic test results M60
- Risk