     1= LhARA end station R&D and vertical beam line development meeting : 21Sep21; xx:00 BST =
     2
     3== Notes ==
     4
     5__2 year objectives:__
     61. Consultation with ‘users’. TP ran an earlier consultation – results from this should be fed into this consultation. We note that there will be differing requirements for different users, for example.
     7 a. Jason P set up could be relatively simple but could need additional infrastructure for hypoxia among other requirements
     8 b. RFI – objectives here are much more complex and require significant infrastructure investment.
     92. Systems engineering – basic reality check – layout - see previous Neil Bliss input to WP6
     103. ‘Small’ investment in BU beamtime. Can we provide money for access costs for Birmingham and use this to attract other diagnostics groups. ~£1k/day – 20-25 days over 2 years? Set up days can be zero cost to user if appropriately scheduled.
     11
     12__5 year objectives:__
     13
     14Instrumentation of a ‘low energy’ system fit for use. Requires beam monitoring on beamline and immediately before test station.
     15Diagnostics should include:
     161. Current pick ups
     172. CarstenW gas system
     18a. Post Doc plus PhD?
     19b. Needs expt
     203. Sci Wire – JM RAL
     214. TPrice larger 2D system
     225. Outcomes from yr1-2 task3
     23
     24__Additional notes:__
     25
     26• TP notes Ionisation chamber will not work – NPL input confirms this.
     27• TP discuss with Stuart Green ‘other groups with money’ potential to collate numerous smaller money pots to provide sufficient funds for end station work.
     28• JP if it were possible to get Birmingham vertical beam line up and running relatively quickly, we could use Birmingham as a test bed for LhARA, this would allow tests at a mock-up an end station. In terms of diagnostics testing the vertical beam line is not required.
     29