Changes between Version 1 and Version 2 of Research/GaborLens/Meetings/2020/05/07


Ignore:
Timestamp:
May 6, 2020, 1:04:15 PM (5 years ago)
Author:
td1719
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • Research/GaborLens/Meetings/2020/05/07

    v1 v2  
    55
    661. Introduction, notes and actions: KL/All
    7 *KL: (Re)initiate contact with O.Ettlinger, G.Hicks to find support for starting SMILIE source simulations
    8 *TSD: Attempt some tutorial examples from VSIM
     7* **KL:** (Re)initiate contact with O.Ettlinger, G.Hicks to find support for starting SMILIE source simulations
     8* **TSD:** Attempt some tutorial examples from VSIM
     9* **JPo:88 Provide TSD with the geometry of the present prototype Gabor lens
     10* **KL/RB**: Take a look at the Bingham et al paper on laser-driven accelerator for medicine
     11* **RB:** Introduce Titus to D. Spears and find the ISIS person to contact about access to VSim
    912
    10 *JPo: Provide TSD with the geometry of the present prototype Gabor lens
     132. Review of calculation of instability: **RB**
     14 
     153. Updates on the particle generation: **HT**
    1116
    12 *KL/RB: Take a look at the Bingham et al paper on laser-driven accelerator for medicine
     174. Updates on the simulation of Gabor lens: **TSD**
    1318
    14 *RB: Introduce Titus to D. Spears and find the ISIS person to contact about access to VSim
    15 2. Review of calculation of instability: RB
    16 3. Updates on the simulation of Gabor lens: TSD
    17 4. Discussion of next steps: ALL
     195. Discussion of next steps: **ALL**
    1820
    1921== Connection details ==