Changes between Version 7 and Version 8 of Research/GaborLens/Meetings/2020/07/09


Ignore:
Timestamp:
Jul 16, 2020 3:09:29 PM (4 years ago)
Author:
longkr
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • Research/GaborLens/Meetings/2020/07/09

    v7 v8  
    11= Gabor Lens meeting: 09Jul20; 16:00 BST =
    2 
    3 **Present:**
    42
    53== Notes ==
    64
     51. //Introduction, notes and actions//: **KL/All**
     6 * No actions recorded.
     7
     82. //Progress on beam experiments paper//: **TN**
     9 * Drawings obtained from P.Savage; Dimensions, coil configuration are complete.  Agreed that TN will take forward to include the draft paper. 
     10 * Noted to that need to retain drawings and CAD package for later use so, **action**:
     11 * **TSD/KL** will post it somewhere once a suitable place on the repository is discussed
     12 
     133. //[raw-attachment:meeting_HTL_090720.pdf Updates on the particle generation]//: **HT**
     14 See slides linked in title of agenda item.  Notes and **actions** agreed in discussion:
     15 * **HT** will contact G.Hicks for input on simulation results.  Depending on the outcome of the meeting with GH, will then move to plan a meeting with Z.Najmudin et al. for further discussion of simulation results.
     16 * **HT**: will send laser parameters used in simulation to RB.
     17 * RB made the suggestion that DS makes a simulation with an older version of VSIM (or perhaps OSIRIS/EPOCH) for comparison.  After discussion we agreed that EPOCH should be used for comparison as this was technically more convenient.  With the results in hand we would work towards a discussion of our results with others, for example M.King.
     18
     194. //[raw-attachment:LhARA_Capture_09Jul20_TSD.pdf  Updates on VSim simulations]//: **TSD**
     20  See slides linked in title of agenda item.  Notes  and **actions** agreed in discussion:
     21 * TSD had made check on the induced electric field and begun to set up the simulation for the existing prototype lens.
     22 * We discussion the best method to initialise the electron plasma in the simulation and agreed that TSD should consider simulating the onset of a discharge in VSIM.
     23
     245. //ERC proposal//: **KL/All** \\
     25 [raw-attachment:2020-07-09-B1.docx Updated "B1"] \\
     26 [raw-attachment:2020-07-09-B2.docx​ Updated "B2"]
     27
     286. //AOB//: **All**
     29 * **KL**: will make contact with A.Howard to enquire about TimePix.
    730
    831=== Summary of actions: ===
     32 * **TSD/KL** will post it somewhere once a suitable place on the repository is discussed
     33 * **KL**: will make contact with A.Howard to enquire about TimePix.
     34 * **HT** will contact G.Hicks for input on simulation results. 
     35 * **HT**: will send laser parameters used in simulation to RB.
     36 * **KL**: will make contact with A.Howard to enquire about TimePix.
    937
    1038---