Version 10 (modified by 4 years ago) ( diff ) | ,
---|
Gabor Lens meeting: 09Jul20; 16:00 BST
Summary of actions:
- TSD/KL will post it somewhere once a suitable place on the repository is discussed
- KL: will make contact with A.Howard to enquire about TimePix.
- HT will contact G.Hicks for input on simulation results.
- HT: will send laser parameters used in simulation to RB.
- KL: will make contact with A.Howard to enquire about TimePix.
Notes
- Introduction, notes and actions: KL/All
- No actions recorded.
- Progress on beam experiments paper: TN
- Drawings obtained from P.Savage; Dimensions, coil configuration are complete. Agreed that TN will take forward to include the draft paper.
- Noted to that need to retain drawings and CAD package for later use so, action:
- TSD/KL will post it somewhere once a suitable place on the repository is discussed
- Updates on the particle generation: HT
See slides linked in title of agenda item. Notes and actions agreed in discussion:
- HT will contact G.Hicks for input on simulation results. Depending on the outcome of the meeting with GH, will then move to plan a meeting with Z.Najmudin et al. for further discussion of simulation results.
- HT: will send laser parameters used in simulation to RB.
- RB made the suggestion that DS makes a simulation with an older version of VSIM (or perhaps OSIRIS/EPOCH) for comparison. After discussion we agreed that EPOCH should be used for comparison as this was technically more convenient. With the results in hand we would work towards a discussion of our results with others, for example M.King.
- Updates on VSim simulations: TSD
See slides linked in title of agenda item. Notes and actions agreed in discussion:
- TSD had made check on the induced electric field and begun to set up the simulation for the existing prototype lens.
- We discussion the best method to initialise the electron plasma in the simulation and agreed that TSD should consider simulating the onset of a discharge in VSIM.
- ERC proposal: KL/All
Updated "B1"
Updated "B2"
- AOB: All
- KL: will make contact with A.Howard to enquire about TimePix.
---
Agenda
- Introduction, notes and actions: KL/All
- Progress on beam experiments paper: TN
- ERC proposal: KL/All
Updated "B1"
Updated "B2"
- AOB: All
Attachments (4)
- 2020-07-09-B1.docx (41.6 KB ) - added by 4 years ago.
- 2020-07-09-B2.docx (27.6 KB ) - added by 4 years ago.
- LhARA_Capture_09Jul20_TSD.pdf (859.7 KB ) - added by 4 years ago.
- meeting_HTL_090720.pdf (766.3 KB ) - added by 4 years ago.
Download all attachments as: .zip
Note:
See TracWiki
for help on using the wiki.