Gabor Lens meeting: 27Aug20; 16:00 BST
Summary of actions
- CW Setup meeting with M.King to discuss results.
- KL Get CW a wiki account.
Notes
- Introduction, notes and actions: KL/All
- None
- Big news: proposal submitted! KL will post to the applications page on the LhARA page on the wiki.
- Progress on beam experiments paper: TN
Meeting today: not so much progress because of work on the proposal. Hope to make more progress next week.
- Updates on the particle generation: HT
HTL has found paper describting 2D and 3D TNSA simulations. Paper suggests that 2D simulation over-estimates cut-off energy. Indication that present results on end-point is a factor of 2 different between 3D estimate and 2D estimate. Needs now to look at how scaling for energy is done.
2D gives over-estimate of the flux because in 3D force goes as 1/r2. In 2D its a cylindrical structure making it a 1/r dependence.
Agree that need to get a 3D simulation for comparison. Need to get a meeting with M.King at Strathclyde. Need to benchmark the codes.
Action: CW Setup meeting with M.King to discuss results.
- Updates on simulation of "IC" lens: TSD
See slides. Points noted:- Offset of magnetic and electric axes does not lead to an offset in the centroid of the electron-cloud rotational motion.
- CW comments that he wants now to review the new design to see how to introduce an ExB rotation.
- ERC proposal: KL/All
- Submitted; now we wait.
- AOB: All
- KL: EPSRC THT: need to worry about how we present the activity. General feeling is that we should apply.
Agenda
- Introduction, notes and actions: KL/All
- None
- Progress on beam experiments paper: TN
- Updates on the particle generation: HT
- ERC proposal: KL/All
- AOB: All
Last modified
4 years ago
Last modified on Aug 27, 2020, 4:41:20 PM
Attachments (1)
- LhARA_Capture_27Aug20_TSD.pdf (257.5 KB ) - added by 4 years ago.
Download all attachments as: .zip
Note:
See TracWiki
for help on using the wiki.