Changes between Version 4 and Version 5 of Research/GaborLens/Meetings/2020/09/03
- Timestamp:
- Sep 3, 2020, 4:51:24 PM (4 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
Research/GaborLens/Meetings/2020/09/03
v4 v5 1 1 = Gabor Lens meeting: 27Aug20; 16:00 BST = 2 2 3 4 3 == Summary of actions == 4 * **KL** Get CW a wiki account. 5 5 6 6 == Notes == 7 8 1. //Introduction, [wiki:Research/GaborLens/Meetings/2020/08/27 notes and actions]//: **KL/All** 9 * **CW** Setup meeting with M.King to discuss results. 10 - *Done.** Email exchange done, just need to set up the meeting. 11 * **KL** Get CW a wiki account. 12 - **Stands.** 13 14 2. //Progress on beam experiments paper//: **TN** \\ 15 - Intro rewritten. Progress no on the editing of first sections. Focus to move onto other parts of paper. 7 16 17 3. //[raw-attachment:meeting_HTL_030920.pdf Updates on the particle generation]//: **HT** 18 - See slides; points noted: 19 - Excellent that the loop has been closed between the generation of the particles and the BDSIM/GPT simulation. 20 - Need to review coordinate transformation performed to generate 3D distributions for transmission to beam-line simulation. 21 - HTL and CW will collaborate to work towards meeting with M.King. 22 23 4. //[raw-attachment:LhARA_Capture_03Sep20_TSD.pdf Updates on simulation of "IC" lens]//: **TSD** 24 - See slides; pointd noted: 25 - Observed rotation of plasma and development of 4-fold symmetry. 26 - Initial simulation of passage of 1 MeV protons attempted. Issues with initial distribution and distribution at screen. 27 28 5. //AOB//: **All** 29 - TB: Entry for logo for competition submitted. 30 8 31 ---- 9 32