Gabor Lens meeting: 03Sep20; 16:00 BST
Summary of actions
- KL Get CW a wiki account.
Notes
- Introduction, notes and actions: KL/All
- CW Setup meeting with M.King to discuss results.
- Done. Email exchange done, just need to set up the meeting.
- KL Get CW a wiki account.
- Stands.
- CW Setup meeting with M.King to discuss results.
- Progress on beam experiments paper: TN
- Intro rewritten. Progress no on the editing of first sections. Focus to move onto other parts of paper.
- Updates on the particle generation: HT
- See slides; points noted:
- Excellent that the loop has been closed between the generation of the particles and the BDSIM/GPT simulation.
- Need to review coordinate transformation performed to generate 3D distributions for transmission to beam-line simulation.
- HTL and CW will collaborate to work towards meeting with M.King.
- See slides; points noted:
- Updates on simulation of "IC" lens: TSD
- See slides; pointd noted:
- Observed rotation of plasma and development of 4-fold symmetry.
- Initial simulation of passage of 1 MeV protons attempted. Issues with initial distribution and distribution at screen.
- See slides; pointd noted:
- AOB: All
- TB: Entry for logo for competition submitted.
Agenda
- Introduction, notes and actions: KL/All
- CW Setup meeting with M.King to discuss results.
- KL Get CW a wiki account.
- Progress on beam experiments paper: TN
- AOB: All
Last modified
4 years ago
Last modified on Sep 3, 2020, 5:06:45 PM
Attachments (2)
- meeting_HTL_030920.pdf (356.7 KB ) - added by 4 years ago.
- LhARA_Capture_03Sep20_TSD.pdf (506.5 KB ) - added by 4 years ago.
Download all attachments as: .zip
Note:
See TracWiki
for help on using the wiki.