wiki:Research/GaborLens/Meetings/2020/09/03

Gabor Lens meeting: 03Sep20; 16:00 BST

Summary of actions

  • KL Get CW a wiki account.

Notes

  1. Introduction, notes and actions: KL/All
    • CW Setup meeting with M.King to discuss results.
      • Done. Email exchange done, just need to set up the meeting.
    • KL Get CW a wiki account.
      • Stands.
  1. Progress on beam experiments paper: TN
    • Intro rewritten. Progress no on the editing of first sections. Focus to move onto other parts of paper.

  1. Updates on the particle generation: HT
    • See slides; points noted:
      • Excellent that the loop has been closed between the generation of the particles and the BDSIM/GPT simulation.
      • Need to review coordinate transformation performed to generate 3D distributions for transmission to beam-line simulation.
      • HTL and CW will collaborate to work towards meeting with M.King.
  1. Updates on simulation of "IC" lens: TSD
    • See slides; pointd noted:
      • Observed rotation of plasma and development of 4-fold symmetry.
      • Initial simulation of passage of 1 MeV protons attempted. Issues with initial distribution and distribution at screen.
  1. AOB: All
    • TB: Entry for logo for competition submitted.

Agenda

  1. Introduction, notes and actions: KL/All
    • CW Setup meeting with M.King to discuss results.
    • KL Get CW a wiki account.
  1. Progress on beam experiments paper: TN

  1. Updates on the particle generation: HT
  1. Updates on simulation of "IC" lens: TSD
  1. AOB: All

Last modified 4 years ago Last modified on Sep 3, 2020 5:06:45 PM

Attachments (2)

Download all attachments as: .zip